BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2025 at 7:00 PM

Updated December 5, 2025

Renovation of a mixed-use development in Quebec, Quebec. Completed plans call for the renovation of a educational facility.

Reference number: 20103172 The Centre de services scolaire des Premieres-Seigneuries wishes to retain the services of a general construction contractor for ventilation addition work at the Assomption elementary school located at 2 965 St-Samuel Avenue, Quebec (Quebec) G1C 3V4. The main works related to this project are: These works are mainly of the electromechanical type. Main works not limited to: In plumbing/heating Addition and replacement of control valves on the hot water heating water network in the school Different plumbing work Drainage works Hot and cold water supply - Connection of humidifiers Perform insulation work on plumbing pipes. In ventilation Demolition work in ventilation Toilet Drainer Air exchanger Demolition of ducts Etc. Installation of two 550 l/s air exchangers Perform insulation work on the ventilation ducts. Installation of air humidifiers Installation of electrical coils. Do the installation of air ducts Installation of two heat pumps with DX coils Installation of swan necks and roof sheds. The air balancing work. In regulation Remove and recover the control points of the removed mechanical equipment. Remove any control wiring not reused Take control of the new equipment installed as part of this project and integrate them into the existing control sequences of the school. Replacement of existing probes with electronic temperature probes with CO2 and relative humidity readings. (For classes) Replacement of existing probes from the common places with blind temperature probes Replacement of the low voltage thermostat with a temperature probe with display. Modification of the control mode of existing heaters Installation of presence detectors in the premises Taking control of the air exchangers Takeover of heat pumps Taking control of the new electric coils Deposit the graphics on the servers of the school service center Programming of new sequences controls new equipment. Etc. In electricity Relocation of mechanical/electrical equipment Connection of new mechanical equipment. Lighting work. Perform temporary electrical work (lighting, power supply) New electrical input 600V, 200A Installation of new electrical heating devices with control relay. Dismantling Disconnection of window air conditioners Disconnection of the existing air exchanger Disconnection of fixtures ETC. Work on the existing fire alarm system Relocation and addition of fire detectors Adding smoke detectors in ventilation ducts Adding an interlock relay for shutting down ventilation systems Programming the existing fire alarm panel. Etc. Addition and replacement of some luminaires Etc. Structure Works exterior slab Interior floor structure Floor reinforcement. Filling of concrete blocks. Etc. Architecture and general contractor Coordination of work Demolition and drillings for the transition of mechanics to asbestos conditions or not Demolition of existing suspended ceilings Ragging of walls int. /ext, insulation, waterproofing Painting in the school. (Walls, ceilings, floors, ventilation ducts, electrical conduits, etc.) Preparation and painting of the mechanical rooms Protection and movement of goods and furniture Coordination of construction cleaning work in sequence with the deep cleaning work managed by the CSS Interior systems work Access hatches and fire-resistant sealing Adjustment/adaptation of existing furniture Soft tile floors Work on suspended ceilings Safety management on the construction site Roofing work Outdoor fences Etc. Delivery schedule Start of Works: June 1, 2026 End of the Works: November 13, 2026 Implementation schedule June 1, 2026 to November 13, 2026 (construction site) Clarification on the work schedule School period (25-26) - June 1, 2026 to June 26, 2026 Daytime work in the mechanical rooms will be allowed provided that the air exchanger is not stopped. However, in order not to disturb the students, the contractor will have to carry out his noisiest work outside of class hours. Traffic with vehicles in the schoolyard will not be allowed during recess. Window air conditioner The dismantling work on window air conditioners and that the work to relocate the electrical outlets of the air conditioners will be allowed only after the air conditioning period in the fall of 2026. This work must be coordinated with the owner. Other milestones and/or conditions The shutdown of the heating system must be coordinated with the owner. Normally, the heating can be stopped on June 1, 2026. Work in the school will begin after 6 PM and must be completed by 5 AM the next morning. This work must be coordinated with the owner. The weekend work in the school will be done in coordination with the client and will start after 6 PM on Friday and must be completed and before 5:00 AM on Monday. The contractor must ensure that the corridors and classrooms are clean before the students arrive. During this period, the ceilings may remain open. However, the contractor must not leave anything hanging from the ceilings. School leave period (June 29, 2026 to August 14, 2026) Day work will be allowed in the school. The work can also be carried out in the evenings and at night. Construction holidays (July 19, 2026 to August 1, 2026) o Considering the scope of work, contractors should consider requesting an agreement between the employer and the union to be able to work during the construction holiday. Failing to meet this demand, the contractors will have to assume the acceleration costs of the work to meet the schedule. School period (26-27) - August 17, 2026 to November 6, 2026 The grand cleaning of classes must start on August 17, 2026. The schoolyard field finishing work must be completed by August 24, 2026. To allow for the cleaning for the next school year, day work in the school will no longer be allowed from August 17, 2026. The grand cleaning of the school must be completed by August 24, 2026. The work in the mechanical rooms will be able to take place during the day without restriction until the arrival of the students on August 26, 2026 From August 26, 2026, work in the mechanical rooms can take place during the day. However, in order not to disturb the students, the contractor will have to carry out his noisiest work outside of class hours. The weekend work in the school will be done in coordination with the client and will start after 6 PM on Friday and must be completed and before 5:00 AM on Monday. The contractor must ensure that the corridors and classrooms are clean before the students arrive. During this period, the ceilings may remain open. However, the contractor must not leave anything hanging from the ceilings. The new ventilation systems Commissioning of the new ventilation systems must take place no later than August 26, 2026. Window air conditioner Dismantling work on window air conditioners will be allowed from October 1, 2026. Heating equipment must be functional by 1 October 2026. The energy management system must also be functional. Week of October 19, 2026, provisional acceptance and deposit of the construction site end documents. (TQC, maintenance manuals, letters of guarantee, ETC.) From October 19, 2026 to November 6, 2026, corrections of deficiencies On November 9, 2026, final acceptance of the project. Those interested can obtain the tender documents on the electronic tendering SÉAO at www.seao.ca or toll free at 1-866-669-7326.

Award

Educational

$842,491.00

Public - State/Provincial

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
32
Bidding Soon
884
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2025

June 1, 2026

Project location map

2965 Avenue St Samuel, Quebec, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.