BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2026 at 7:00 PM

Updated January 15, 2026

Site work and new construction of a mixed-use development in Leesburg, Virginia. Conceptual plans call for the construction of a 112,000-square-foot, 1,200-seat clubhouse / community center; theater / auditorium; educational facility; and for site work for a clubhouse / community center.

As of January 14, 2026, per owner, the project is in the planning phase, and no project has been established in the County Capital Improvement Program beyond planning at this time. The Loudoun County Board of Supervisors approved the project’s preferred alternative in its Jan. 22 meeting over two other competing options. The board’s approval moves the project into the planning and design phase, but a construction date has not been established. The county will spend $181.3 million to build an updated community arts center, creating a centralized hub for the region’s performance and artistic culture. The Eastern Loudoun County Community Arts Center will be a fully integrated building supporting both performing and visual arts. The facility will cover more than 112,000 square feet, consisting of numerous configured spaces to accommodate performances and galleries. The most prominent aspect of the building will be its multi-purpose performance hall, providing a venue for theater and professional performances with between 800 and 900 seats. The hall will feature a main stage and acoustics designed to support a wide range of performance types. The county will also factor in dedicated performance support spaces, including a proscenium, orchestra pit and full working grid. A secondary enhanced blackbox theater containing between 300 and 350 seats will provide additional space for performances outside of the performance hall. The theater will feature similar benefits to a standard blackbox theater, including dedicated equipment and enhanced acoustics. A banquet hall for pre- and post-show engagements and a rehearsal space to support main stage performances are also included in the project. As part of the approved design, the building will provide attached spaces for art display and art making. To facilitate these areas, the county will incorporate classrooms and multi-use spaces to provide educational opportunities between local artists and the community. Additional space for public and administration services will also be featured in the layout.

Conceptual

Theaters / Auditoriums

$181,300,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
5
Bidding Soon
1,823
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2031

Project location map

To Be Determined, Leesburg, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.