Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 30, 2025 at 8:00 PM
Updated October 31, 2025
Renovation of a mixed-use development in San Fernando, California. Completed plans call for the renovation of a educational facility.
Gridley- Montanez Dual Language Academy - Campus Wide HVAC Replacement and Classroom Conversion to Library (Bv) (Psa) Pkg 1 - Campus Wide Hvac Replacement - Permanent Buildings o Hvac Replacement to Bldg. a Classroom, Bldg. B Classroom, Main Bldg. Admin., Kindergarten Bldg., & Multi-purpose Bldg. o Associated Structural, Electrical, Patch & Repair Work to Wall, Ceiling, Roofing & Pavement. Pkg 2 - Campus Wide Hvac Replacement - Relocatable Buildings o Hvac Replacement to All Relocatable; Classroom Buildings and Toilet Building. o Associated Structural, Electrical, Patch & Repair Work to Wall, Ceiling, Roofing & Pavement. Pkg 3 - Campus Wide Hvac Replacement - Ems Design o Installation of Ems Design Associated With Campus Wide Hvac Replacement of All Permanent Buildings; Kindergarten, Main, Classroom Bldgs. a & B, Multipurpose and All Relocatable Classroom Bldgs. and Restroom Bldg. o Mechanical Hvac and Electrical Work Associated With Ems. Pkg 4 - Classroom Conversion to Library o Conversion of Two Existing Classrooms to One Library o Provide Barrier Free Path of Travel to New Library: O (2) Accessible Parking Stalls O Accessible Path From Sidewalk to School Main Gate O Regrade Existing Path to Under 5% Slope CONTRACTOR performing this project must hold the following license as the prime contractor: B - General Building Contractor. A prime CONTRACTOR self-performing any of the following specialty trades must also hold the required specialty license: C-10 - Electrical C-20 - Warm-Air Heating, Ventilating and Air-Conditioning C-36 - Plumbing Question Deadline 08/20/2025 For information or questions regarding this RFQ contact Oscar Montes at (213) 241-2998 or via email at oscar.montes@lausd.net and BVDBContracts@lausd.net. Anticipated Start Date of Notice to Proceed September 2025 Substantial Completion (1188 calendar days after NTP date): December 2028 Final Completion (1218 calendar days after NTP date): January 2029 Statement of Qualifications (SOQ) DUE DATE:Friday at 2:00 PM on 07/25/2025
Award
Educational
$9,475,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2025
November 10, 2025
1907 8th St, San Fernando, CA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
