Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Renovation of an educational facility in Cincinnati, Ohio. Completed plans call for the renovation of a 2,200-square-foot educational facility.

A general description of project tasks includes: 1. Replacement of two existing Computer Room A/C units with two new units of an equivalent tonnage. Most work will take place in an existing IDS Room (319) that has server equipment that needs to stay operational and conditioned during the course of the project. One existing unit to be replaced is in an adjacent IDS Storage Room (317). 2 units are necessary to remain operational to condition the space during construction. 2. 1800 sf of ceiling and lighting replacement in (317) and (319) with new ceiling tiles, new LED lights and new grid. 3. Minor metal framing and drywall work for refrigeration line-sets. 4. Providing new roof curb for new ACU Condensing Unit. 5. Provide new openings in existing walls for new piping. Reuse existing roof penetration for new refrigeration linesets. 6. Removal of Existing Refrigeration Line-sets. 7. Select patching and replacement of floor tiles as required for ACU replacement and proper unit operation. 8. Integration of new ACUs into Campus BAS. 9. Selective removal and replacement of existing ceiling tiles to facilitate the replacement of the refrigeration line-sets in the hallway outside 319 & 317 and the adjacent classroom (318). 10. New Lighting Controls for new Lighting in 319 and 317. 11. Tie in new ACU units to existing piping for humidification. 12. Existing Server racks need to be protected from dust and debris during construction. 13. Existing server Racks need to be protected during construction from accidental damage. Work shall be completed in accordance with the plans and specifications prepared by SMP Design, which are available in electronic format through the Cincinnati State Purchasing Department The EDGE Participation Goal for the Project is 5.0 percent. For more information about EDGE, contact the Business Certification Compliance Manager at Stacy.Cornett@development.ohio.gov, or at its physical location: 77 South High Street, 28th Floor, Columbus, Ohio 43215; or by telephone at (614) 728-0088. Estimate General Contract $540,000

Bid Results

Educational

$435,000.00

Public - State/Provincial

Renovation

18

16

20

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Membrane Roofing, Built-Up Bituminous Roofing, Built-Up Asphalt Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Painting and Coating, Painting, Interior Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
69
Bidding Soon
1,279
All Active Projects
512
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 1, 2025

img_map_placeholder

3520 Central Pkwy, Cincinnati, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.