BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a playground / park / athletic field in Denver, Colorado. Completed plans call for site work for a playground / park / athletic field.

*As of April 25, 2025, this bid has been awarded and is expected to start next month. The entire project is expected to be completed in 2026. The Park Creek Metropolitan District, a quasi-municipal corporation and political subdivision of the State of Colorado, notifies all qualified persons/companies that proposals will be received for contracting work and services in connection with the construction of Central Park: Filing 63 - Earthwork & Demo. - Filing 63- Demo, Grading, Erosion Control Filing 63 is 21 Acre lot west of E 40th Ave and Central Park Blvd. intersection. This project is going to consist of: import fill, cut and fill onsite, demo, and erosion control set up. The contractor will be working next to the general public where there is an active sidewalk and a bank in the area. Demo areas consist of sidewalk along Central Park Blvd. Import fill will be roughly 25,000 CY. Park Creek Metropolitan will approve import soil based on Geotech report and soils testing. Grading will be spreading out 40,000 CY that is stockpiled on site throughout the project. Roadways will be graded to plus or minus 1 tenth (0.1') from bottom of roadway section and 1' from TBC. Grading has slight high risk as we are grading next Phillips 66 3 petroleum lines along Central Park Blvd. Respondents shall note that a contract is anticipated to be a Brookfield Properties re-assignable contract. Initially, Owner of the contract shall be Brookfield Properties with later re-assignment of the Contract to The Park Creek Metropolitan District. Therefore, any and all references to Owner, District, The Park Creek Metropolitan District made in the Request for Proposal shall be defined as Brookfield Properties/The Park Creek Metropolitan District. Prevailing wage requirements apply. The District will accept proposal that represents best value to District. The District reserves the right to waive irregularities in any proposal. Performance & Payment bonds and proper insurance coverage will be required. Mortenson is an "EOE/ Affirmative Action/ M/ F/ Veteran/ Disabled Employer" *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Site Work

3

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
64
Bidding Soon
1,193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

May 5, 2025

Project location map

To Be Determined, Denver, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.