Site work and renovation of a military facility in Portsmouth, Virginia. Completed plans call civil work for a military facility.

Location of the work: Norfolk Naval Shipyard, Portsmouth, VA Description of the work: REMOVE EXISTING 10" STEAM LINE FROM THE EXTERIOR OF BUILDING 61. INSTALL NEW STEAM LINES ON STRUCTURAL MEMBERS ON THE NORTHSIDE OF BUILDING 61 OVER TO BUILDING 62. REPLACE EXISTING 10" STEAM LINE FROM BUILDING 61 TO BUILDING 73. WORK INCLUDES INSTALLATION OF CONCRETE COLUMNS, STRUCTURAL MEMBERS, AND OVERHEAD CONSTRUCTION AT THE CIA FENCE AND TURNSTILE AT GATE R. NAICS Code: 236220 - Commercial and Institutional Building Construction Time for completion: Contract completion date is 90 calendar days. The days are calculated from date of task order award, which includes the initial 15 days allowed for distribution of the task order award, submission and approval of insurance, bonding and other requirements set forth in the task order/MACC. Task order award is considered notice to proceed. Wage Rate Requirements: Department of Labor (DoL) General Decision Number: VA20250001 dated 03 January 2025 (Attachment C) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination may be issued via amendment. Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $921.00 for each calendar day of delay until the work is completed or accepted. Utilities: In accordance with FAR 52.236-14 Availability and Use of Utility Services - The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. Unless otherwise provided in the contract, the amount of each utility service consumed shall be charged to or paid for by the Contractor at prevailing rates charged to the Government or, where the utility is produced by the Government, at reasonable rates determined by the Contracting Officer. The Contractor shall carefully conserve any utilities furnished without charge. Record Shop Drawings: In accordance with FAR 52.236-21 Specifications and Drawings for Construction, record shop drawings are required, and reproducible copies of these record drawings are required. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Military

$5,000,000.00

Public - Federal

Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
83
Bidding Soon
1,133
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

May 30, 2025

Project location map

1500 Pennock St, Portsmouth, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.