BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated September 5, 2025

Site work and paving for a mixed-use development in Beverly Hills, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Liquidated Damages $1000/day. Project Duration 250 Working days This project replaces over 10,000 feet of of deteriorated potable water main pipelines and appurtenant gate valves, hydrants, and water services. The work also includes trench restoration, pavement restoration, alley approach reconstruction, and striping. Other Details Pay attention to pressure testing and disinfection requirements, phasing, water shutdown coordination, and restoration requirements. Hillcrest Drive (from Carmelita Avenue to just north of Elevado Avenue). Alta Drive (from Carmelita Avenue to Elevado Avenue). Sierra Drive (from Carmelita Avenue to just north of Elevado Avenue). Oakhurst Drive (from Carmelita Avenue to Elevado Avenue). Alley between Sierra Drive and Oakhurst Drive (from Elevado Avenue to Cinthia Street). Elevado Avenue (from Hillcrest Drive to Doheny Drive). SCOPE OF THE WORK - The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements and supplies necessary for, or appurtenant to, the construction and completion of the Water Main Replacements - Various Locations in accordance with Drawing No. 10428 and the specifications prepared for this project. TIME FOR COMPLETION - The Contractor agrees to complete the entire work within 250 working days from Notice to Proceed. ENGINEER'S ESTIMATE - The preliminary cost of construction of this Work has been prepared and the said estimate is $7,100,000.00 CONTRACTORS LICENSE - In compliance with Public Contract Code Section 3300, the City has determined that the Bidder must possess the following license(s): "Class A" THE CITY RESERVES THE RIGHT TO REJECT ANY BID OR ALL THE BIDS AND TO WAIVE ANY INFORMALITY OR IRREGULARITY IN ANY BID, BUT IF THE BIDS ARE ACCEPTED, THE CONTRACT FOR THE IMPROVEMENT WILL BE LET TO THE LOWEST RESPONSIBLE BIDDER FOR THE PROJECT AS A WHOLE. Online Q&A Yes Q&A Deadline 03/13/2025 12:00 PM (PST)

Award

Roads / Highways

$5,557,610.00

Public - City

Paving, Site Work

18

9

4

6

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
618
Active Projects
269
Bidding Soon
3,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

Multiple Locations, Beverly Hills, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.