BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a civil project in Tryon, North Carolina. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

The work to be done consists of fumishing all materials, and Labor necessary for all work tasks associated with the 2024 Water and Sewer System Improvement, generally consisting of: Installation of approximately 2,730 LF of 8" PVC SDR 35 sanitary sewer mains Installation of approximately 140 LF of 8" DIP sanitary sewer mains Installation of approximately 50 LF of 16" steel encasement pipe with 8" DIP sanitary sewer main. Installation of approximately 26 manholes Installation of approximately 390 LF of 6" CIPP lining- Residential service reconnectbns Associated pavement repairs The installation, maintenance, and removal of erosion control facilities Other associated appurtenances for a connplete and proper installation Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner, and shall be for an amount equal to not less than five percent (5%) of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. Performance and Payment Bonds, each in the amount of 100% of the contract price will be required of the successful bidder. EPA MBE/WBE participation goals: MBE 10.9% WBE 10.4% State of NC MBE/WBE participation goal: 10% (combined) Question Deadline 02/28/2025 No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. Each request for such interpretation should be in writing, addressed to Summit Engineering Group, Inc., 9601 Warren H. Abernathy Highway, Spartanburg, South Carolina 29301. To be given consideration, the request must be received at least five days prior to the date fixed for the opening of bid All bidders must order Plans and Specifications directly from Summit Engineering Group Inc. In order to bid on the project you must be added the Plan Holders list to ensure all addendums are received.

Bid Results

Water / Sewer

$1,384,279.00

Public - City

Paving, Site Work

17

11

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
118
Bidding Soon
1,356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 7, 2025

Project location map

Multiple Locations, Tryon, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.