Published March 20, 2025 at 8:00 PM

Updated March 21, 2025

Renovation of an educational facility in North Charleston, South Carolina. Completed plans call for the renovation of a educational facility.

Project Location: 5025 W. Enterprise St. North Charleston , SC 29405 This scope of work includes but is not limited to; provide replacement of rooftop RTU units. System replacement shall include supply and return ductwork modifications, electrical service modifications, and balance and test of new equipment. Units shall be integrated into the existing Siemens control system. SCOPE OF WORK 1. Scope of work includes but is not limited to: provide replacement of rooftop RTU units at Liberty Hill Academy. System replacement shall include supply and return ductwork modifications, electrical service modifications, and balance and test of new equipment. Units shall be integrated into the existing Siemens control system. A more detailed, but not exhaustive or all-inclusive list of scope requirements are shown in Specification. The contractor shall review drawings and specifications carefully to determine the complete scope of the project and not depend solely on the description below. The following list is meant to serve as a general description of the scope of the project. A. Contractor shall maintain the construction entrances. This shall include (but not necessarily be limited to) grading, filling of ruts and potholes, and maintaining proper drainage. Maintenance of entry gates shall also be the contractor's responsibility. Adjacent public streets, sidewalks, curbs, and parking lots shall be swept, scraped, washed and kept clean daily (more often as necessary) throughout all operations. B. Contractor to schedule his work in accordance with all noise ordinances per the authority having jurisdiction. C. Contractor shall provide a letter accepting all project conditions prior to commencing work. D. Contractor shall install all temporary security fencing and covered entrances as required by OSF on the site safety plan shown in the contract drawings. Contractor may use existing school fencing that is in place to achieve this purpose. Contractor is responsible for the any damages to existing fencing. E. Contractor is responsible for grounds maintenance along the perimeter fence. F. Contractor shall provide a project specific safety plan prior to mobilization. G. Contractor shall provide Builder's Risk Insurance. Question Deadline: 03/06/2025 at 12:00 PM ET ll questions should be submitted to Raymond Jenkins prior to the deadline for receipt of questions via Email Raymond_jenkins@charleston.k12.sc.us with copy to Thomas Benedict @ thomas.benedict@cumminggroup.com

Award

Educational

$774,948.00

Public - County

Renovation

12

10

5

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
71
Bidding Soon
764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

March 28, 2025

Project location map

5025 W Enterprise St, North Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.