Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 24, 2025 at 7:00 PM
Updated March 22, 2025
Site work and paving for a civil project in Littleton, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The SWMWSD-2025 DCIP WATER MAIN REPLACEMENT PROJECT includes the replacement, of approximately 1250 LF of 8" water main and 1000 LF of 6" water main with PVC pipe, and approximately 43 water service reconnections, 3 wet taps to concrete asbestos (CA) water lines and asphalt patch paving, roto-milling and overlay per Jefferson County. There is approximately 70 LF of 8" and 6" concrete asbestos (CA) water line removal at connection points. The project is situated in the Southwest Metropolitan Water and Sanitation District, in Littleton, Colorado. Bids may not be withdrawn for a period of forty-five (45) days after the time fixed for bid closing. The Owner reserves the right to waive irregularities or technical defects, so the best interests of the District may be served, and may reject any and all bids, and shall award the contract to the lowest responsible bidder as determined by the District.
Post-Bid
Roads / Highways
$200,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2025
April 21, 2025
Multiple Locations, Littleton, CO
Related To This Project
Littleton, CO
Bid Date: Mar 31 2025
Littleton, CO
Bid Date: Mar 06 2025
Littleton, CO
Bid Date: Apr 10 2025
Littleton, CO
--
Littleton, CO
Bid Date: Apr 03 2025
Littleton, CO
Bid Date: Apr 08 2025
Littleton, CO
Bid Date: Apr 18 2025
Littleton, CO
--
Littleton, CO
Bid Date: Mar 04 2025
Littleton, CO
Bid Date: Mar 06 2025
Littleton, CO
Bid Date: Mar 26 2025
Littleton, CO
Bid Date: Apr 03 2025
Littleton, CO
--
Littleton, CO
Bid Date: Mar 12 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
