Renovation of an educational facility in Belleville, Illinois. Completed plans call for the renovation of a educational facility.

Bid security in the form of a bid bond, certified check, or bank draft in an amount equal to ten percent (10%) of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Trustees, Kankakee Community College. This form is intended to capture minority owned business (MBE), women owned business (WBE), and disabled owned business (PBE) or (DBE) suppliers and/or sub-contractors. The Owner has established an aspirational goal of 30% MBE / WBE / PBE / DBE participation for this project. The College reserves the right to reject any or all bids or parts thereof, or waive any irregularities or informalities, and to make the award in the best interest of the College.. Decisions of the College will be final. All questions regarding any matter concerning this Invitation to Bid must be submitted in writing to Mr. Dominick Demonica, Demonica Kemper Architects. Questions must be emailed to ddemonica@dka-design.com, with "KCC Athletic Building Toilet Rooms in the subject line. No questions will be addressed after 5:00 p.m. (CST) on March 7, 2025, The Work of Project is defined by the Contract Documents and consists of the following: 1. The interior renovation of two Toilet Rooms consisting of approximately 530 SF of space within the Athletic Building. Renovation work includes: demolition, new finishes, and new doors/frames. All mechanical, plumbing, and electrical work is included in the project. WORK BY OWNER A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner. B. Subsequent Work: Owner will perform the following additional work on site after Substantial Completion. Completion of that work will depend on successful completion of preparatory work under this Contract. 1. Furnishing and installation of existing and/or new Fixtures, Furnishings, and Equipment within the College Center. 1.6 ACCESS TO SITE A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

Bid Results

Educational

$270,000.00

Public - City

Renovation

33

17

10

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
99
Bidding Soon
1,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

May 19, 2025

Project location map

100 College Plz Dr, Belleville, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.