BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work and paving for a mixed-use development in Baraboo, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project includes the following Work: Reconstruction of Shaw Street from Willow Street to the Shaw Street Bridge crossing the Baraboo River. The Street will be reconstructed with the same urban cross-section that currently exists, with the addition of a speed table for traffic calming, minor sidewalk replacements, concrete driveway apron replacements, and utility improvements. Work shall include but is not limited to: Traffic Control Erosion and Sediment Control Unclassified Excavation Storm Sewer Utility Work Sanitary Sewer Utility Work Water Utility Work Asphaltic Concrete and Concrete Pavement Aggregate Base Course Concrete Sidewalk, Curb and Gutter Turf and Site Restoration Coordination with Private Utilities The anticipated substantial completion date is 09/26/25 and final completion date is 10/31/2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with the wage rate scale established by local wage rates. Owner reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$280,030.00

Public - City

Paving, Site Work

12

14

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
50
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

March 31, 2025

Project location map

Shaw St, Baraboo, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.