BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work and paving for a mixed-use development in Waco, Texas. Design plans call for site work for a 8,625-square-foot road / highway; and for paving for a sidewalk / parking lot.

Full depth street reconstruction of an existing area to include removal and installation of 8,625 SF of reinforced sidewalk. Herring Ave from 30th St. to McArthur Drive Lyle Ave from 31st St. to 30th St. 30th St. from Herring Ave. to Lyle Ave. As of February 26, 2025, this project is in the process of getting approvals. An architect has been selected. Information regarding how and when a general contractor will be selected has not yet been confirmed. Construction is estimated to begin July 2025.

Design

Roads / Highways

$480,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
82
Bidding Soon
1,626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

Project location map

Herring Ave, Waco, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.