Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 10, 2025 at 8:00 PM
Updated April 26, 2025
Site work and paving for a mixed-use development in Point Comfort, Texas. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; for paving for a sidewalk / parking lot; and playground / park / athletic field.
https://myemail.constantcontact.com/Texas-Government-Insider.html?soid=1112918611731&aid=AmEdVmD9ADU The Texas General Land Office (GLO) will allocate $58.4 million to support regional mitigation projects across the state. The awards will enable five counties and four cities to advance essential street improvement, water infrastructure, drainage and flood mitigation projects. The following are a selection of the projects receiving support: The city of Dickinson will receive $15.8 million to improve drainage and progress a siphon drainage project. In total, the city will build a detention pond, install trunklines, improve ditches and replace driveway culverts. San Jacinto County will spend $14.2 million on a suite of drainage and road improvement projects across 11 locations. These efforts will primarily entail roadway surface reconstruction and repair, roadside ditch reshaping, culvert replacement and erosion and sediment control. The county will also install interceptors and outfalls to improve drainage systems. Refugio County will use $11.6 million for road, drainage, lift station and wastewater treatment plant (WWTP) improvements at 11 locations. Road and drainage improvements will include excavating bases, treating surfaces, installing prime coats, textiles crown and base, regrading ditches and outfall structure and installing piping. The Woodsboro WWTP will have its clarifier rehabilitated and electrical systems and bar screen upgraded. The county will also improve the Bayside WWTP by installing chlorination equipment, upgrading the chlorination chamber, removing sludge and replacing a line. The Bayside Water Facility will receive a new reverse osmosis pilot plant, grates and membranes. Finally, Refugio County will install pumps and remove, replace and upgrade lift stations and electrical controls at multiple sites in the town of Refugio. The GLO will award the remaining grants to the following locations: Calhoun County will spend $4.1 million to improve ditches, remove and replace culverts, install riprap, repair driveways, restore roadways, improve and modify outfalls and install headwalls, spillways and a splash pad. The city of Bishop will spend $3.8 million to regrade ditches, repair culverts, install piping, replace manholes and repair streets. Coryell County will receive $3.4 million to remove bridges and roadways, excavate channels, install arches, replace roadways, remove and replace culverts, adjust utilities and install drains, pipes and inlets. Gonzales will use $3 million to build detention ponds. Work will include acquiring easements, excavation, building embankments and installing base, overflow structure and pipes. The city of Round Top will receive $2 million to improve street surfacing and drainage by excavating, reclaiming and recompacting pavement, installing asphalt and bases and replacing driveway culverts. Plans also include improving channel and outfall structures, upsizing, reconnecting and moving waterlines and installing fire hydrants. · Brazos County will spend the remaining $500,000 to demolish and reconstruct roads, replace driveway culverts and regrade ditches. -------------------- Public Notice The City of Point Comfort is seeking Competitive Sealed Proposals for Improvements to the City's Public Access Boat Ramp and Waterfront Park. Scope of Work: 1. Concrete Bulkhead Replacement/Repair 2. Concrete Work 3. Surveillance Cameras with Solar Lights 4. Removal and Replacement of Play Equipment Includes Labor, Equipment & Materials For questions. The City reserves the right to reject any and/or all proposals and to accept any proposals deemed by the City as providing the best value for and being most beneficial to the City, and to waive all formalities in the proposed process. (#3238) For questions, specifications and additional details please contact Don Doering, City Administrator, 102 Jones St., Point Comfort, Texas 77978, phone 361-987-2661, email ddoering@pointcomfort.org Scope of Work: Boat Ramp Bulkhead Cap Repair: Concrete Work (+/-) 500 Linear Feet Demolition of Concrete Cap & Disposal Demolition of approximately 12" of Concrete Slope to allow Cap to Wrap around Concrete Wall Repour Cap with 4,000 psi Concrete, #4 Rebar 12" on Center & Expansion Joints as required. Scope of Work: Installation of 1. 8 Smart Solar LED Lights 2. 2 Surveillance cameras with remote viewing Includes Labor, Equipment & Materials Concrete Work 1. Ramped Area of Road to Boat Ramp Approximate 4,000 sq. ft. 5" 3000 psi Concrete #4 Rebar - 12' on center Expansion Joints, Keyway, G-Seal as required Demolition & Excavation Traffic signage & Control
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 12, 2025
April 11, 2025
Multiple Locations, Point Comfort, TX
Related To This Project
Point Comfort, TX
--
Point Comfort, TX
Bid Date: Oct 02 2024
Point Comfort, TX
Bid Date: Feb 02 2024
Point Comfort, TX
Bid Date: Jul 06 2023
Point Comfort, TX
Bid Date: Mar 16 2023
Point Comfort, TX
Bid Date: Apr 12 2022
Point Comfort, TX
Bid Date: Aug 05 2021
Point Comfort, TX
Bid Date: Mar 25 2022
Laredo, TX
Bid Date: Mar 20 2025
Deer Park, TX
--
Taylor, TX
--
Denton, TX
--
Houston, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
