BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 26, 2025 at 8:00 PM

Updated April 27, 2025

Site work and paving for a civil project in Houston, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

ID:24170-125-10065-000, 2410180161 Type:Sanitary Sewer Rehabilitation Owner:Newport Municipal Utility District Location Harris County, TX Scope In general, this work consists of Pipebursting of sanitary sewer lines including service reconnections in kind, remove and replace external drop stack connections, and cleanout replacements. Rehabilitation of a partially cast iron, sanitary sewer line with tuberculation. Note: cast iron pipe may be under pavement. Rehabilitation of sanitary sewer lines using the Cured-In-Place Pipe (CIPP) method. Offset of existing water line in order to perform pipebursting of sanitary sewer. All water line offsets must comply with TCEQ and COH requirements. Combination repair, point repair, and service repair of sanitary sewer lines. Rerouting sanitary sewer service lines as needed within the easement to reconnect existing services. All rerouted sanitary sewer service lines must be directed by Engineer and may include situations like services crossing property lines and routing service lines around various obstructions. Television inspection of sewer lines after completion of rehabilitation work. Trench safety as required per Section 01561, implementation and maintenance of traffic control, and bypass pumping, as necessary, throughout the project. Contractor to note that these plans may not include all necessary Traffic Control Plans. Contractor to ensure traffic control is executed as necessary to facilitate work. Contractor is responsible for obtaining any and all permits required for street cuts and/or traffic control. Coordinating with District Operations Staff and Engineer to reduce and maintain flow from lift station into the sanitary sewer system in order for rehabilitation work to be performed. Site restoration including removal and replacement of damaged sidewalks, driveways, concrete patios, wooden decks, asphalt pavement, irrigation lines, turf, plants, shrubs, fences, trees, and other miscellaneous items. Contact Address Lockwood, Andrews & Newnam, Inc. 3700 West Sam Houston Parkway South Houston, Texas 77042 Contact Info Contact: Lilly Boehler Phone: 346-440-1846 Email:lmboehler@lan-inc.com PID- 2410180161

Bid Results

Water / Sewer

$735,039.00

Public - City

Paving, Site Work

17

13

6

4

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
259
Bidding Soon
3,356
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

May 15, 2025

Project location map

Multiple Locations, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.