EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 5, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Tulsa, Oklahoma. Completed plans call for the renovation of a educational facility.

Bids must be accompanied by a bid security in the amount of 5% of the bid. Owner reserves the right to reject any or all bids and to waive informalities or minor irregularities in any bid. Attention is called to the fact that a designated completion date for this project site will be established based on the number of calendar days, as stated in the accepted bid, required to complete the Project work. There will be a $2500 Liquidated Damages Clause for each day the contract is not completed. The scheduled completion date will be a very significant and material factor to the owner when selecting the Lowest Responsible Bid. Work Includes: BUR ROOF RESTORATION AND REPLACEMENT - MCLAIN HIGH SCHOOL - MAINTENANCE AND TRANSPORTATION BLDG LAUNDRY ROOM (ROOF SECTIONS N & M) 1. Where designated, Roof Restoration shall include removing all loose aggregate, asphalt bitumen, dirt, and sediment using a heavy-duty industrial vacuum. Surface shall be cleaned thoroughly. 2. Where designated, remove existing roofing, insulation, all flashings etc., down to the existing decking substrate. 3. Where designated, remove and replace all wet insulation identified by infra-red scan and designated by marking paint. Removal and replacement of all wet insulation shall be included in the roof contractors bid proposal. Roof contractors are to field verify all wet insulated areas and dimensions, deck type, insulation composition and thickness. It may be necessary, due to contract delays, for the approved and selected roof contractor or contractors to remark areas to identify wet insulated areas. 4. Remove and repair blisters, ridges, buckles and other existing roofing membrane irregularities. 5. Refer to Roof Section 3.06 to determine roof sections that require the removal of the existing aggregate and flood coat. Roof Sections not identified under Roof Section 3.06 shall require full restoration. 6. Repair and reinforce perimeter metal edge, wall and curb flashings and all projection flashings and details in strict accordance with roof specifications and manufacturer’s requirements. 7. Replace all rotted and/or weathered wood blocking supports andreplace with new with strap. 8. All plumbing, piping, utility conduit, railing and ladders shall be cleaned, primed, and painted. Color selected by TPS. 9. Apply the final flood coat of restoration coating at 7.5 gallons per 100 sq. ft. and broadcast new and clean aggregate. 10. Roof system manufacturers shall provide their Ten (10) year roof system inspection, preventative maintenance, and housekeeping program. See Section 1.11 for coverage requirements The Roofing Contractors shall include in their bid proposal the following cost for possible contingencies, unknowns such as deck repairs, wood blocking replacement, fascia replacement, roof drains etc. The balance of this fund shall be credited to TPS upon the completion of this project. McLain High School - $ 80,000.00 Laundry Room Building - $ 5,000.00

Post-Bid

Educational

$85,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
55
Bidding Soon
670
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 10, 2025

img_map_placeholder

4929 N Peoria Ave, Tulsa, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Roof Repairs at McLain High School, Will Rogers Field House & Maintenance & Transportation Laundry

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.