Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 5, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of an educational facility in Tulsa, Oklahoma. Completed plans call for the renovation of a educational facility.
Bids must be accompanied by a bid security in the amount of 5% of the bid. Owner reserves the right to reject any or all bids and to waive informalities or minor irregularities in any bid. Attention is called to the fact that a designated completion date for this project site will be established based on the number of calendar days, as stated in the accepted bid, required to complete the Project work. There will be a $2500 Liquidated Damages Clause for each day the contract is not completed. The scheduled completion date will be a very significant and material factor to the owner when selecting the Lowest Responsible Bid. Work Includes: BUR ROOF RESTORATION AND REPLACEMENT - MCLAIN HIGH SCHOOL - MAINTENANCE AND TRANSPORTATION BLDG LAUNDRY ROOM (ROOF SECTIONS N & M) 1. Where designated, Roof Restoration shall include removing all loose aggregate, asphalt bitumen, dirt, and sediment using a heavy-duty industrial vacuum. Surface shall be cleaned thoroughly. 2. Where designated, remove existing roofing, insulation, all flashings etc., down to the existing decking substrate. 3. Where designated, remove and replace all wet insulation identified by infra-red scan and designated by marking paint. Removal and replacement of all wet insulation shall be included in the roof contractors bid proposal. Roof contractors are to field verify all wet insulated areas and dimensions, deck type, insulation composition and thickness. It may be necessary, due to contract delays, for the approved and selected roof contractor or contractors to remark areas to identify wet insulated areas. 4. Remove and repair blisters, ridges, buckles and other existing roofing membrane irregularities. 5. Refer to Roof Section 3.06 to determine roof sections that require the removal of the existing aggregate and flood coat. Roof Sections not identified under Roof Section 3.06 shall require full restoration. 6. Repair and reinforce perimeter metal edge, wall and curb flashings and all projection flashings and details in strict accordance with roof specifications and manufacturer’s requirements. 7. Replace all rotted and/or weathered wood blocking supports andreplace with new with strap. 8. All plumbing, piping, utility conduit, railing and ladders shall be cleaned, primed, and painted. Color selected by TPS. 9. Apply the final flood coat of restoration coating at 7.5 gallons per 100 sq. ft. and broadcast new and clean aggregate. 10. Roof system manufacturers shall provide their Ten (10) year roof system inspection, preventative maintenance, and housekeeping program. See Section 1.11 for coverage requirements The Roofing Contractors shall include in their bid proposal the following cost for possible contingencies, unknowns such as deck repairs, wood blocking replacement, fascia replacement, roof drains etc. The balance of this fund shall be credited to TPS upon the completion of this project. McLain High School - $ 80,000.00 Laundry Room Building - $ 5,000.00
Post-Bid
Educational
$85,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 28 - Electronic Safety and Security
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 10, 2025
4929 N Peoria Ave, Tulsa, OK
Related To This Project
Tulsa, OK
Bid Date: Mar 11 2025
Tulsa, OK
Bid Date: Mar 13 2025
Tulsa, OK
--
Tulsa, OK
Bid Date: Mar 25 2025
Tulsa, OK
Bid Date: Mar 21 2025
Tulsa, OK
Bid Date: Mar 21 2025
Tulsa, OK
Bid Date: Mar 18 2025
Tulsa, OK
Bid Date: Mar 06 2025
Tulsa, OK
Bid Date: Mar 12 2025
Tulsa, OK
Bid Date: Mar 06 2025
Tulsa, OK
--
Tulsa, OK
Bid Date: Mar 06 2025
Tulsa, OK
Bid Date: Mar 13 2025
Tulsa, OK
Bid Date: Mar 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Roof Repairs at McLain High School, Will Rogers Field House & Maintenance & Transportation Laundry
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.