BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated April 30, 2025

Site work for a playground / park / athletic field in Shelby Township, Michigan. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000377186 Delivery Point: Clerk's Office Purchase Type: One Time Only- Delivery Date: Upon Award Project Overview: The Charter Township of Shelby Parks, Recreation, Maintenance, Senior, and Nature Center department is seeking proposals for a professional landscape or playground contractor to collaborate with the Township to design and install a nature playscape at the Burgess-Shadbush Nature Center (4101 River Bends Drive). Scope and Specifications: Create a Phased Design Plan and layout play equipment within designated area (see image below). Phase 1 should include play equipment that will not exceed the budget set in this bid. This bid is only for engineering/construction of Phase 1. Phase 2 should include potential play equipment that could be added in the future if additional funding is secured. These costs should be listed on a document separate from your Proposal Sheet so as not to exceed the bid's maximum budget of $300,000. The Township is interested in a unique play area with interactive, kinetic, inclusive, natural, and ADA play options that offer a great play value score. All play equipment needs to be ASTM F1487 compliant. Play equipment is preferred to contain natural wood elements to better fit the forest environment. Equipment should foster a sense of "playing in the woods", with preference for equipment that offers opportunities to climb, crawl, balance, and jump across logs, ropes, and/or rocks. This space should feel more like a natural play area vs. a traditional playground. There should be at least: One (1) play structure or area for children 2-5 One (1) play structure or area for children 5-12 Total square footage of play structures including fall zones must be kept within designated space. Includes playground surfacing/fall material to meet IPEMA specifications and be accessible by wheeled adaptive devices. Proposals should include design, engineering and installation of drainage systems. Design, engineering and installation of walkway leading to play area. Site preparation and excavation Township PRM will be responsible for the installation of fencing but should be included in your design plan. Acceptance/Rejection the Township reserves the right to accept any bid, to reject any and all bids in whole or part or to waive any irregularities in any bid that is in the best interest of the Township.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
315
Active Projects
156
Bidding Soon
2,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

December 29, 2025

Project location map

4101 River Bends Dr, Shelby Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.