Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 24, 2025 at 7:00 PM
Updated February 25, 2025
Site work for a playground / park / athletic field in Sarasota, Florida. Design plans call for site work for a playground / park / athletic field.
As of February 24, 2025, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in summer 2025, with construction starting January 2026 and ending in december 2026. This project is included in the City of Sarasota's FY 2025-2029 Capital Improvement Program. Significant erosion on the southeast side of the park has been occurring for three years, with a dramatic loss of shoreline in 2020. An initial "Basis of Design Report" was provided by an Engineering/Design Service Firm. The first choice is to approach the engineering with a focus on plantings to increase resiliency instead of seawalls or other hard forms. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Playgrounds / Parks / Athletic Fields
$750,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 5, 2026
Ken Thompson Pkwy, Sarasota, FL
Related To This Project
Sarasota, FL
--
Sarasota, FL
Bid Date: Mar 07 2025
Sarasota, FL
Bid Date: Mar 14 2025
Sarasota, FL
Bid Date: Apr 01 2025
Sarasota, FL
Bid Date: Apr 01 2025
Sarasota, FL
Bid Date: Apr 04 2025
Sarasota, FL
--
Sarasota, FL
Bid Date: Mar 24 2025
Sarasota, FL
Bid Date: Mar 12 2025
Sarasota, FL
Bid Date: Mar 07 2025
Sarasota, FL
Bid Date: Feb 26 2025
Sarasota, FL
Bid Date: Mar 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
