Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 4, 2025 at 8:00 PM
Updated April 5, 2025
Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.
Reference Number 0000375208 Question Deadline 03/11/2025 at 6:00 PM MT Questions are submitted online Yes This project will collect flow impacting the Elvado Rd alignment and convey flow to the existing storm drain infrastructure near the Elvado Rd and 6th Ave intersection which provides drainage connectivity through/under the 6th Ave alignment to the Elvado Wash on the west side of 6th Ave. All work is to be completed pursuant to the Construction Documents prepared by Kimley Horn & Associates, dated January 28, 2025, which are attached herein. Estimated cost for the project is between $2,000,000.00 and $2,400,000.00. The project shall be complete and in place within 150 working days from Notice to Proceed. Liquidated damages for late delivery will be assessed per PAG 2015 Specification Section 108-9. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. General Requirements - Bid Deposit Required - Federally Funded Bonding Requirements - Bid Bond 10 % - Performance Bond 100 % - Payment Bond 100 % Pricing Item Based Bid open info : Public Bid Opening will be held via Microsoft Teams: +1 602-649-0382,,343357978# United States, Phoenix Phone conference ID: 343 357 978# PRE-BID MEETING: MICROSOFT TEAMS LINK: +1 602-649-0382,,464940099# United States, Phoenix Phone conference ID: 464 940 099# Certified Disadvantaged Business Enterprise (DBE) firms are encouraged to participate, and Respondents are encouraged to maximize the use of certified DBEs where possible. All Prime Contractors submitting bids to Pima County must include the signed EPA Form 5700-49 (Certification Regarding Debarment, Suspension, and Other Responsibility Matters). Scope of Work This project will collect flow impacting the Elvado Rd alignment and convey flow to the existing storm drain infrastructure near the Elvado Rd and 6th Ave intersection which provides drainage connectivity through/under the 6th Ave alignment to the Elvado Wash on the west side of 6th Ave.
Award
Water / Sewer
$1,638,225.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
May 19, 2025
E Elvado Rd & S 6th Ave, Tucson, AZ
Related To This Project
Tucson, AZ
--
Tucson, AZ
Bid Date: Feb 27 2025
Tucson, AZ
--
Tucson, AZ
Bid Date: Apr 01 2025
Tucson, AZ
Bid Date: Apr 18 2025
Tucson, AZ
Bid Date: Mar 17 2025
Tucson, AZ
Bid Date: Mar 07 2025
Tucson, AZ
--
Tucson, AZ
--
Tucson, AZ
Bid Date: Aug 22 2019
Tucson, AZ
Bid Date: Mar 18 2025
Tucson, AZ
Bid Date: Mar 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
