Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Site work and paving for a mixed-use development in Tucson, Arizona. Design plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of September 30, 2025, a design firm has been selected for the project. Per the owner firm timeline for construction has not been established. *The closed solicitation has been included below for reference: Reference Number 0000377835 Pima County is seeking Statements of Qualifications (SOQ) from qualified firms to provide design engineering services for a 10 ft. wide and .68 mile long paved multi-use path along the east side of South Houghton Road from Camino del Toro to Forrest Feezor St., and Vista Monte Drive to Sahuarita Road. The middle segment between Forrest Feezor St. and Vista Monte Drive has an existing multi-use path to which this project will connect. This project consists of but is not limited to, paving, path drainage crossing alternative at Forrest Feezor St., surveying and mapping, and replacing existing vegetation. Bid Intent Optional Bid Intent Deadline 03/24/2025 Question Deadline 03/18/2025 at 6:00 PM MT Questions are submitted online Yes .County will not accept verbal requests for clarifications or interpretations. Offerors must submit any questions or deviation requests through the online . General Requirements - Insurance Required - License Required Certified Small Business Enterprises (SBE) firms are encouraged to participate. Pima County reserves the right to reject any and all qualification statements or withhold the award for any reason.
Design
Sidewalks / Parking Lot
$600,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2026
S Houghton Rd, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Apr 18 2025
Tucson, AZ
Bid Date: Mar 17 2025
Tucson, AZ
Bid Date: Mar 07 2025
Tucson, AZ
Bid Date: Apr 18 2025
Tucson, AZ
Bid Date: Mar 11 2025
Tucson, AZ
Bid Date: Mar 24 2025
Tucson, AZ
Bid Date: Mar 28 2025
Tucson, AZ
Bid Date: Apr 01 2025
Tucson, AZ
--
Tucson, AZ
Bid Date: Feb 27 2025
Tucson, AZ
--
Tucson, AZ
Bid Date: Mar 18 2025
Tucson, AZ
Bid Date: Mar 18 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
