BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Demolition, site work, paving and new construction of a civil project in Centre Wellington, Ontario. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and bridge / tunnel.

Replace the superstructure at Bridge 3-WG. This bridge located on Fourth Line adjacent to the intersection of Eramosa Garafraxa Townline and Fourth Line, in the Township of Centre Wellington. The following is a general but not necessarily a complete description of the works: Removal of the existing superstructure including railing system, deck and girders Partial removal of the existing substructure Reconfiguration of the substructure to accommodate a new superstructure Construction of a new superstructure including steel girders, concrete deck and concrete railing system Bridge deck waterproofing Hot mix asphalt paving Steel beam guide rail Restoration to a preconstruction state or better Question Deadline: Tue Mar 4, 2025 2:00:00 PM (EST) Duration in months: 5 Documents can be obtained from Bids and Tenders - https://centrewellington.bidsandtenders.ca/Module/Tenders/en/Tender/Detail/6aa4a6ee-5b00-4cd1-b260-c597c8d1c441

Award

Bridges / Tunnels

$899,786.00

Public - City

Demolition, New Construction, Paving, Site Work

17

8

2

7

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
109
Bidding Soon
4,474
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

April 14, 2025

Project location map

4 Line, Centre Wellington, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.