BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work for a water / sewer project in Aspen Cove, Newfoundland. Completed plans call for site work for a water / sewer project.

Closing Time: 2:00 PM (NT) ** Please note that there has been 2 addendum issued for this project. ** Question Acceptance Deadline 2025/03/09 02:00:00 PM NST Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. SCOPE OF WORK The scope of work generally includes, but is not necessarily limited to all items shown on the Project Drawings and more particularly described in the MERX Schedule of Quantities and any additional work as directed by the Engineer: General: • Mobilization of all labour, equipment, and materials to the project site. • The supply & Installation of one (1) project sign. • The supply & placement of approximately 483 meters of 150mm PVC DR 18 PC 235 watermain. • The supply & placement of approximately 24 meters of 100mm PVC DR 18 PC 235 Post Hydrant Leads. • The excavation of approximately 1597 cubic meters of main trench material, with approximately 240 cubic meters of this quantity estimated to be rock excavation. • The excavation of approximately 602 cubic meters of service trench material, with approximately 92 cubic meters of this quantity estimated to be rock excavation. • The supply & Installation of pipe and fittings for seventeen (17) water services. • The supply & Installation of approximately 84 m HDPE culverts of various sizes. • The supply and installation of 19.05 meters of guiderail and 2 sloped and buried guide rail sections as per the Municipal Master Construction Specifications. • The cleaning and deepening of approximately 538 m of existing ditches and channels. • The supply & Installation of 4 Post Hydrants (1.8 m bury). • All reinstatement and cleaning of properties as required. • The completion of all deficiencies as directed by the Engineer including final cleanup and demobilization from the project site. The above general outline of principal aspects of the project does not in any way limit the responsibility of the Contractor to furnish all required labor, equipment and materials to perform all work as detailed on the project drawings and required by the contract documents

Award

Water / Sewer

$452,506.00

Public - City

Site Work

8

5

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
1
Bidding Soon
106
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 8, 2025

Project location map

To Be Determined, Aspen Cove, NL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.