BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 18, 2025

Site work and paving for a bridge / tunnel in Fort Smith, Arkansas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

A bid security in the amount of 5% shall accompany each bid, ifthe bid is more than $50,000.00. Pursuant to Ark. Code Ann. 22-9-203, the State encouragesall small, minority, and womenbusiness enterprises to submitbids for capital improvements. Encouragement is also made to all general contractors that in theevent they subcontract portions oftheir work, consideration is given to the identified groups. All references to the Owner shall be interpreted to mean the Agency for whom the work is being contracted. INSTRUCTIONS TO BIDDERS Section 00 21 13 / Rev: August 2021 BIDDING DOCUMENTS. Bidders may obtain complete sets of Contract Documents from issuing office designated in the Invitation to Bid. Complete sets of Contract Documents must be used in preparing bids; neither Owner nor Design Professional assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. Obtaining Contract documents through any source other than the Design Professional listed in the Invitation to Bid is not advisable due to the risks of receiving incomplete or inaccurate information, and the bidder runs the risk of basing bidder's proposal on such information. The documents obtained through the Design Professional or his representative(s) or DBA are considered the official version and take precedence if any discrepancies occur. The fact that documents used for bidding purposes are named "contract documents" does not diminish in any way the right of the State to reject any and all bids and to waive any formality. If any person contemplating submitting a Bid is in doubt as to the true meaning of any part of the Contract Documents or finds discrepancies in or omissions from any part of the Contract Documents, he may submit to the Design Professional a written request for an interpretation or correction thereof not later than five (5) calendar days before Bid opening. In those instances where a Design Professional is not involved with the project, written requests for interpretation or correction may be made to the DBA Construction Section within the time frame stated above. Bidders shall not make additions, notations, clarifications, reservations, or exceptions to the bid form proposal or include additional documents regarding additions, notations, clarifications, reservations, or exceptions. See also # 6.1. Segregated bids, alternate bids or assignments ("additions") shall not be considered. The reading of a bid is not inclusive of the Bidder's additions, notations, clarifications, reservations, or exceptions and shall not change the Bidder's responsibilities and duties to provide all labor, materials, services and equipment necessary for, or incidental to, the construction of the project pursuant to the contract documents, including the time set forth and the lump sum base bid stated in the bid proposal. Address all communications regarding the Contract Documents to the Design Professional. In those instances where a Design Professional is not involved, address all such communications to DBA Construction Section, 501 Woodlane, Suite 101N, Little Rock, AR 72201 (501-682-1833).

Bid Results

Bridges / Tunnels

$438,326.00

Public - State/Provincial

Paving, Site Work

11

14

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

Project location map

To Be Determined, Fort Smith, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.