Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Site work and paving for a mixed-use development in Geneva, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Contractors shall submit complete bids in single, sealed envelopes with the words "2025 STREET IMPROVEMENTS" clearly marked on them. Question Deadline 03/05/2025 Bidders questions on the intent or meaning ofthe bid documents shall be submitted in writing. Bidders questions on the intent or meaning of any part(s) ofthe bid document received less than 5 days prior to the bid opening date will not be responded to Bids submitted after the time specified will be returned to the bidder unopened. Bids that are not complete will not be read out loud after opening and will be returned. Description of Work The 2025 STREET IMPROVEMENTS include resurfacing of sixteen (16) City streets for combined length of three (3) miles, the repaving of a parking lot, and the construction of on-street parking using WMA. Pavement marking, sidewalk & curb removal and replacement, sidewalk repairs (trip hazard removal) and pavement maintenance (patching and crack filling) on various City streets. This project also includes the placement of 2 inch electric conduit, drainage improvements, and the lining of a 6 inch water main. Disturbed green spaces shall be restored with topsoil, seed, mulch and fertilizer. Bidders Instructions Bidders shall submit a current copy of their IDOT prequalification at the time the bid documents are received. Bidders who are not IDOT prequalification for the estimated quantities shown in the bid documents shall also submit affidavits and references as proof that they have completed similar projects for other agencies. 3) Bidders shall be required to show that they have the ability to complete the majority of this project with their own crew(s). 4) Bidders shall submit two (2) complete copies of their Bids. 5) All proposals shall be accompanied by a proposal guaranty equaling an amount not less than 5% of the bid amount. This guaranty may be in the form of a bid bond or cashieraEUR(TM)s check made out to the City of Geneva with the name of the project clearly written in the notes. 6) The City of Geneva, Illinois reserves the right to reject any or all bids and waive technicalities. 7) The quantities appearing in the summary of quantities are approximate and are prepared for comparison of bids. Payment to the Contractors will be made only for in place quantities and for work completed & accepted and/or for materials furnished and used according to the contract. The scheduled quantities of work to be done and materials to be furnished may be increased, decreased or omitted as hereinafter provided. 8) Submission of a bid is conclusive assurance and warranty that the bidder has examined the plans, specifications, visited the site and understands all requirements for the performance of the work. The bidder shall be responsible for all errors and omissions in their bid package including those resulting from failure or neglect to conduct an in-depth examination of the site, the plans and the specifications. In no case will the City be responsible for any cost, expenses, losses or changes in anticipated profits resulting from any errors and omissions. 9) The bidder shall not take advantage of any errors or omissions in the bid documents. 10) Bidders may withdraw their proposal providing the bidder makes a request to withdraw their proposal in writing or in person before the scheduled time of the bid opening. 11) All employees and suppliers working on this project shall be paid no less than the prevailing wage determined by the Illinois Department of Labor at the time of the bid opening or as adjusted thereafter. 12) The Contractor shall certify that they are not in violation of, nor has been convicted, for a violation of the Illinois Public Construction Act.
Award
Roads / Highways
$2,408,351.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 10, 2025
May 1, 2025
Multiple Locations, Geneva, IL
Related To This Project
Geneva, IL
Bid Date: Mar 04 2025
Geneva, IL
Bid Date: Jul 14 2025
Geneva, IL
Bid Date: Mar 07 2025
Geneva, IL
Bid Date: Mar 27 2025
Geneva, IL
Bid Date: Mar 17 2025
Geneva, IL
Bid Date: Apr 07 2025
Geneva, IL
Bid Date: Apr 03 2025
Geneva, IL
Bid Date: Apr 15 2025
Geneva, IL
Bid Date: Mar 11 2025
Geneva, IL
Bid Date: Mar 07 2025
Geneva, IL
Bid Date: Feb 18 2025
Geneva, IL
Bid Date: Jan 23 2019
Geneva, IL
Bid Date: Feb 03 2025
Geneva, IL
--
Geneva, IL
Bid Date: Jan 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
