Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 7, 2025 at 8:00 PM
Updated July 8, 2025
Site work and paving for a mixed-use development in Little Falls, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of June 16, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** in general, work consists of the following estimated quantities: Traffic Control 1 EA Mobilization 1 LS Clearing and Grubbing, Tree Removal 0.4 Acre Remove Lighting Unit 2 EA Remove Split Rail Fence 790 LF Remove Bituminous Pavement 1940 SY Salvage Topsoil 50 CY Construct Temporary Driveway 1 EA Common Excavation 5500 CY Soil Stabilization Geogrid, Tensile strength 1,400 psf per linear ft 6900 SY Armormax 75 System With B1 Anchor 950 SY Armormax 75 System With B2 Anchor 750 SY Aggregate Base Class 5 (CV) 300 CY Drainable Aggregate (1-In to 3-In Granite) 10 CY Type SP 9.5 Wearing Course Mixture (2, C) 1.5" 2300 SY Type SP 9.5 Wearing Course Mixture (2, C) 2.0" 2300 SY Reinforced Soil Slope Earth Wall 4500 SF Coarse Filter Aggregate (Drainage Layer) 90 CY Random Riprap (Class 1) 400 CY Random Riprap (Class V) 110 CY 3-ft Minimum D50 Boulder 15 EA Install Traffic Barrier Treated Wood Post and Rail 155 LF Install Wooden Fence 190 LF Floatation Silt Fence Type Moving Water 600 LF Silt Fence, Type HI 1200 LF Sediment Control Log Type Wood Fiber 725 LF Storm Water Management 1 LS Common Topsoil Borrow 450 CY Turf Establishment 0.5 AC Water 1 Mgal Rolled Erosion Prevention Category 15 100 SY Root Wad and Bole 10 EA Wattling 285 LF Parking Lot Stripping 1 LS ADA Compliant HC Parking and HC Sign 1 LS Question Deadline 05/09/2025 All questions regarding the bidding documents shall be directed to the Senior Project Manager: Roger Clay at 651-415-6683 or by e-mail at roger.clay@ulteig.com. All questions must be received in writing or by email on or before 7 days prior to the bid opening.
Award
Water / Sewer
$688,484.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2025
June 13, 2025
To Be Determined, Little Falls, MN
Related To This Project
Little Falls, MN
Bid Date: Mar 20 2025
Little Falls, MN
Bid Date: Mar 20 2025
Little Falls, MN
Bid Date: Mar 20 2025
Little Falls, MN
Bid Date: Apr 01 2025
Little Falls, MN
Bid Date: Jun 05 2025
Little Falls, MN
Bid Date: Apr 09 2025
Little Falls, MN
Bid Date: May 01 2025
Little Falls, MN
Bid Date: May 01 2025
Little Falls, MN
Bid Date: Mar 20 2025
Little Falls, MN
Bid Date: Mar 12 2025
Little Falls, MN
Bid Date: Apr 08 2025
Little Falls, MN
Bid Date: Mar 18 2025
Little Falls, MN
Bid Date: Mar 13 2025
Little Falls, MN
Bid Date: Feb 06 2025
Little Falls, MN
Bid Date: Feb 06 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
