BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and new construction of a library in Moreno Valley, California. Conceptual plans call for the construction of a 79,290-square-foot library; and for site work for a library.

This project proposes to construct a new three-story Library Learning Resource Center (LLRC) at Moreno Valley College. Current student enrollment places strain on the ability of the College to equitably provide library and learning resource center services within the existing facility. The project improves and expands space dedicated to library, interdisciplinary computer laboratories, and audio/visual media space. The existing Library lacks space to accommodate the existing student body, is instructionally inadequate for student success and teaching, and has outdated technological infrastructure that struggles to keep up with campus demands. The proposed new Library Learning Resource Center will provide students with upgraded resources for information access and additional space for individual/group study, library services, faculty and student services offices, and audio/visual media services. In addition to library and learning resource functions, the proposed facility will be a center of activity for the College and include space for the Student Activity Center. The proposed Library Learning Resource Center will encompass 79,290 Gross Square Feet (GSF) and consist of 53,140 Assignable Square Feet (ASF). Functional space within the building will include 2,104 ASF of classroom, 2,904 ASF of laboratory, 6,603 ASF of office, 27,796 ASF of library, 3,796 ASF of audio/visual media, and 10,457 ASF of other support space. The proposed building will be located on the existing Parking Lot G site. The building will be adjacent to student Drop-Off on Krameria Street, which will put the facility at the planned center of campus. The existing Library, Student Activities Center, and Bookstore will be inactivated as a secondary effect of the proposed project. As of March 13, 2026, this project is included in the Riverside Community College's 2027-2031 Capital Improvement Program (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Library

$67,980,964.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
4
Bidding Soon
2,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

16130 Lasselle St, Moreno Valley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.