EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a power facility in Omaha, Nebraska. Completed plans call for the renovation of a power facility.

All roofs require complete caulking restoration. The existing caulking is to be removed and replaced with new caulking to completely seal all openings and seams. All roofs require complete roof coatings to include pressure washing, repairs to cracks, punctures and rust spots, applying a primer coat if required, and applying the roof coating according to the manufacturer instructions. The gutter joint seam caulking is to be removed and replaced with new caulking to completely seal the joints. A downspout on the east side of the Administration and Control Room buildings is be extended into the sidewalk to match others in the area. Replace one elbow. 100020000016 Furnishing of all supplies, materials, equipment, labor, and superintendence to: District Roof Caulking Replacement and Coatings Liquified Natural Gas Plant 5801 North 120th Street It is important to note that if the bid pertains to technology services, Bidder certifies that it complies with the requirements of the Nebraska Foreign Adversary Prohibition Act: Nebraska Foreign Adversary Prohibition Act. The Bidder certifies and agrees that it has read and shall comply with the Nebraska Foreign Adversary Contracting Prohibition Act (Neb. Rev. Stat. 73-901 to 73-907). Specifically, Seller verifies and agrees (1) that Seller is not a scrutinized company as defined in Neb. Rev. Stat. 73-903; (2) that Seller will not subcontract with a scrutinized company for any aspect of performance of the contemplated contract presented in connection with the Purchase Order; and (3) that any products or services to be provided by Seller do not originate with a scrutinized company. For questions concerning specifications and project details, contact Keri Kasun, Facilities Management Coordinator, at 402.504.0684 or by email at keri_kasun@mudnebr.com.

Post-Bid

Power Plant

$100,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
40
Bidding Soon
433
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 11, 2025

img_map_placeholder

5801 N 120th St, Omaha, NE

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

District Roof Caulking Replacement And Coatings

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.