BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated March 12, 2025

Site work and paving for a road / highway in Marshfield, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Washington Avenue - Reconditioning Town Road Improvement Project (TRIP-S) Washington Avenue beginning at the intersection of Heritage Drive continuing north to 29th St (Approximately 5,280 feet) is a LRIP Supplemental Town Road Improvement Project. Milling asphalt depth, approximately 1.5" (13,150 SY), grade, shape so base is crowned to a 2 percent from center line, compact, pave 2,000 tons of type 4MT 58-28S, 2.5 inches thick placed in 1-2.5" lift 11 feet wide per lane, place 475 tons of compacted 1/4 " crushed aggregate for shoulder 4 foot wide by 2.5 inches deep with a shoulder machine and compacted with a smooth drum or pneumatic roller. Approaches to Mill Creek Bridge will be milled full width and paved back to match existing pavement width. Asphalt driveways will have a milled butt joint approximately 8 feet from edge of pavement. All work to be completed by August 29, 2025. All work and materials shall be in accordance with Wisconsin Department of Transportation standard specifications for Structure Highway and Construction, 2025 Edition. The Town of Cameron reserves the right to reject any or all bids or to accept any bid they deem most advantageous to the town.

Post-Bid

Roads / Highways

$600,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
25
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 10, 2025

Project location map

S Washington Ave, Marshfield, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.