Site work and renovation of a civil project in Marshfield, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The proposed construction consists of the addition of four chemical feed pumps, tanks, radar level systems as well as tubing and valves located at areas provided on the drawings and other miscellaneous items of work. Acquiring and installing four ortho/polyphosphate feed systems for the Marshfield Water Utility. The work will occur at the main Water Treatment Facility (WTF) (two systems for separate feeds), Wildwood and Southside areas. The work entails demolition of an existing caustic tank and associated piping at the WTF location. The Caustic Tank has been cleaned and flushed out but the associated piping may have some residual caustic in it. Take necessary precaution when demolishing this piping. Secondary containment PVC piping for the orthophosphate tubing will also be required. The secondary piping will not be used in areas where there is a turn or change in direction; only in straight sections where practical. An allowance for SCADA work has been included for Altronix (L.W. Allan). The work also includes electrical installation of wiring for power and sensor wiring for the pumps and level controls

Post-Bid

Water / Sewer

$200,000.00

Public - City

Renovation, Site Work

11

15

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas and Liquid Storage, Gas and Liquid Storage Equipment

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
26
Bidding Soon
307
All Active Projects
144
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

img_map_placeholder

2601 E 34th St, Marshfield, WI

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Orthophosphate Chemical Feed System

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.