Site work for a religious / funeral development in Edisto Island, South Carolina. Completed plans call for site work for a religious / funeral development.

Cost estimate: $85,261.28 Project partially funded by SC Dept of Archives & History. Repair brick wall at historic Lawton-Seabrook Cemetery, Edisto Is. Managed by Neale Hightower of Lawton and Allied Families Assoc. Time of Completion The undersigned agrees to initiate the Work within ten (10) consecutive calendar days from the date set forth in the Notice to Proceed and to complete the Work on or before Date of Substantial Completion as defined in the agreement. The Project shall be completed by November 1, 2025. Liquidated Damages The Undersigned Agrees That in the Case of Failure on the Part of the Contractor to Complete the Work on the Date Of Substantial Completion, the Contractor Shall Pay to Lawton and Allied Families as Liquidated Damages the Sum of Five Hundred Dollars ($500.00) for Each Consecutive Calendar Day the Actual Contract Time Exceeds the Specified Contract Time and the Work Remains Substantially Incomplete. Bid Guarantee It is Agreed That No Persons or Company Other Than the Firm Listed Below or as Otherwise Indicated Hereinafter Has Any Interest Whatsoever in This Proposal of the Contract That May Be Entered Into as a Result Thereof and That In All Respects the Proposal is Legal and Fair, Submitted in Good Faith and Without Collusion or Fraud. SCOPE OF WORK The stabilization of the brick perimeter wall will include the following in addition to the "Lawton-Seabrook Cemetery Restoration Project Specifications Manual" (Attachment A). 1. Inappropriate repair mortars will be removed and replaced with historically appropriate materials to ensure a more accurate and sympathetic restoration of the original construction. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. 2. Bricks will be salvaged and cleaned of biological growth and old mortar in preparation for reuse. Chemical or physicaltreatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. Lawton-Seabrook Cemetery Wall Stabilization -Bid Invitation pg. 2 3. Brick, mortar, and stucco surfaces will be thoroughly cleaned to remove biological growth and environmental staining. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. 4. Portland cement wall cap will be removed and replaced with historically appropriate materials, and damaged sections of the wall and wall cap will be reconstructed using historically accurate materials and techniques. Distinctive materials, features, finishes, and construction techniques or examples of craftsmanship that characterize a property will be preserved. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and where possible materials. Replacement of missing features will be substantiated by documentary and physical evidence. 5. Structural crack repairs and repointing of defective mortar joints will be carried out as needed. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. 6. The entry gate columns will be cleaned, repointed, and rebuilt as required. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. Distinctive materials, features, finishes, and construction techniques or examples of craftsmanship that characterize a property will be preserved. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and where possible materials. Replacement of missing features will be substantiated by documentary and physical evidence. 7. Areas affected by rust-jacking from previous iron gate hardware will be repaired, including any necessary brick replacement. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature will match the old in design, color, texture, and where possible materials. Replacement of missing features will be substantiated by documentary and physical evidence. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Religious / Funeral

$85,261.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
78
Bidding Soon
717
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

7938 Steamboat Landing Rd, Edisto Island, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.