BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a transportation facility in Anderson, South Carolina. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

Anderson Co. seeking bids for Runway 17-35 Reconstruction Project All bidder questions must be received by the end of the day, March 17, 2015. Address all questions to: allpurchasing@andersoncountysc.org. This project generally consists of runway pavement reconstruction for the Runway 17-35 system at the Anderson Regional Airport. This project involves reconstruction of the secondary runway pavement at Anderson Regional Airport (AND). The secondary runway, Runway 17-35, is approximately 5,000' long and 100' wide with 25' wide paved shoulders. The paved shoulders will be removed, and the pavement will be reconstructed using Full Depth Reclamation (FDR). The new FDR pavement section will include approximately 12,900 tons of asphalt at a depth of 4 inches. In addition, there will also be modifications to the lighting and electrical systems associated with Runway 17-35 and its connecting taxiways. Additional runway safety area grading is also included as an additive bid. The project will include demolition, paving, erosion control, lighting/electrical, and pavement markings.

Post-Bid

Transportation Terminals

$500,000.00

Public - County

Paving, Site Work

84

14

37

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
116
Bidding Soon
1,183
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

Project location map

5805 Airport Rd, Anderson, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.