Site work for a civil project in Wellsburg, West Virginia. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Installation of approximately 1,500 LF of 8" and 6" PVC SDR-35 Gravity Sewer, approximately 1,800 LF of 2" HDPE IPS DR-11 Forcemain, one (1) 35 GPM wet well lift station, and all other necessary and related appurtenances and restorations. The Work will be substantially completed within 180 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 210 days after the date when the Contract Times commence to run. Liquidated damages shall be $500 per day. Bids shall be accompanied by a certified check or bid bond payable to Brooke County Public Service District in an amount equal to five percent (5%) of the base bid. DBE Requirements - Each Bidder must fully Comply with the Disadvantaged Business Enterprises, and Affirmative Action Requirements, as identified in the contract documents. The Bidder agrees to make "positive efforts" to subcontract a portion of the total value of the contract to Disadvantaged Business Enterprises. This shall be done in compliance with the six (6) affirmative steps as outlined in 40 CFR 33.240. Failure to demonstrate positive efforts to do so may lead to rejection of bids. For this program, the term "subcontract" includes all construction, modification, and service work contracted for by the bidder in the execution of the work under this contract. The Brooke County Public Service District reserves the right to reject any and all bids. Business firms which are 51 percent owned by minorities or women, but are in fact manag Question Deadline 03/20/2025 Biddershallsubmit all questions about the meaning or intent of the Bidding Documentsto Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. As indicated at Pre-Bid Conference. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$726,150.00

Public - County

Site Work

32

23

29

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
301
Active Projects
158
Bidding Soon
1,535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

Project location map

Multiple Locations, Wellsburg, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.