Published February 28, 2025 at 7:00 PM
Updated October 1, 2024
Site work and new construction of a water / sewer project in Sawyer, Oklahoma. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary acquisition planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought announcement or any follow up information requests. Respondents will be notified upon request following the sources sought evaluation results. The U.S. Army Corps of Engineers (USACE) - Tulsa District (SWT) is conducting market research for an anticipated Design-Bid-Build contract and intends to solicit proposals on or about July 2025. The type of set-aside decision(s) to be issued will depend upon the responses to this Sources Sought announcement and associated market research. The work is located at Hugo Lake, approximately as indicated. The exact storage and work locations will be shown by the Contracting Officer. Final delivery of the bulkhead segments will be within 5 miles of 3107 US Hwy 70 E, Sawyer, OK 74756. Provide a new segmental Bulkhead Assembly that is used to block water from flowing through the tainter gate bays while the tainter gates are being serviced or inspected. The Bulkhead Assembly is comprised of six individual 51-foot-long hollow steel tubular segments, which are assembled in the reservoir to create a single bulkhead. The assembled floating bulkhead will be ballasted with water using mechanical pumps and rotated to a vertical orientation for placement against the tainter gate piers. Provide a crane pad to allow for closer access to the lake for deployment and retrieval of the segmental bulkhead. The Bulkhead can be assembled and disassembled in the water. Bulkhead segments can be removed and stored out of the water when not in service. The work includes the fabrication, shipment, field assembly, testing of a segmental bulkhead and incidental related work, and the construction of a crane pad. Optional Work: Contractor must remove and dispose of the existing bulkhead The purpose of this Sources Sought is to gain knowledge of the interest, capabilities and relevant experience of all business size standards to provide construction for work assigned to USACE Southwest Division (SWD) as well as USACE national initiatives, international, & interagency support. The Government must ensure there is adequate interest and competition among the potential pool of responsible firms. Interested Small Business, Section 8(a), Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB), Service-Disabled Veteran Owned Small Business (SDVOSB) Concern, and Large Businesses are highly encouraged to respond to this Sources Sought. The total contract capacity is estimated between $5,000,000.00 and $10,000,000.00. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Water / Sewer
$10,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2026
3107 US-70, Sawyer, OK
Related To This Project
Sawyer, OK
Bid Date: May 08 2025
Sawyer, OK
Bid Date: Sep 15 2022
Oklahoma City, OK
Bid Date: May 13 2025
Oklahoma City, OK
Bid Date: Feb 28 2025
Piedmont, OK
Bid Date: Mar 18 2025
Salina, OK
Bid Date: Mar 26 2025
Watonga, OK
Bid Date: Mar 18 2025
Tulsa, OK
Bid Date: May 15 2025
Turpin, OK
Bid Date: Mar 21 2025
Panama, OK
Bid Date: Mar 06 2025
Midwest City, OK
Bid Date: Mar 25 2025
Ardmore, OK
Bid Date: Feb 24 2025
Alva, OK
Bid Date: Mar 14 2025
Fort Gibson, OK
Bid Date: Feb 24 2025
Snyder, OK
Bid Date: Feb 24 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Cut Costs, Not Corners.
Get ahead of project risks by targeting the right work early. With detailed construction data at your fingertips, you can pursue jobs that match your margins—and walk away from those that don’t.
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.