BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Renovation of a mixed-use development in Estevan, Saskatchewan. Completed plans call for the renovation of a municipal facility; and fitness / recreation center.

The design and installation of the new boilers shall meet or exceed the following criteria. Project budget estimate $550,000 (CDN) dollars. Proposed boiler must meet the required BTU output of the existing equipment (please refer to pictures provided above and can be reviewed during site visit) Must meet all applicable safety, regulatory, TSASK and CSA standards. All drawings for design/ operation must be signed/ sealed by professional Engineers. Must meet applicable code requirements for design and operation in the province of Saskatchewan. Equipment selection and installation with 20-year life expectancy. Proponents must include the recommended maintenance schedule to attain that lifespan including operations manuals and warranties on materials and labour All components, parts and hardware must be new materials only. Inclusive and barrier free access to facility during construction. Site securement through construction, maintain cleanliness and site restoration upon completion so that all disturbed areas are operationally ready. Question Deadline 03/12/2025 Any questions raised by potential proponents shall be submitted in email format. The city will respond to all inquiries no later than 24 hours. If an addendum is necessary, it will be via email to proponents and posted to Online. There will be no addendums within 72 hours of RFP closing. All inquiries related to the RFP shall be directed to: Chris Dunne will be the project manager and can be reached at 306-634-0674 Chris Dunne, Facility Manager City of Estevan 701 Souris Ave, Estevan, SK S4A 2T1 (306) 634-0674 c.dunne@estevan.ca Proposed project schedule to completion by May 31, 2025 (Pending product and equipment availability) Documents are available at www.sasktenders.ca

Occupancy

Fitness / Rec Centers

$492,765.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
11
Bidding Soon
72
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 23, 2025

Project location map

Multiple Locations, Estevan, SK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.