BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated March 20, 2025

Site work for a power facility in Grand Island, Nebraska. Completed plans call for site work for a power facility.

Site Address: 100 East First Street City: Grand Island County: Hall State/Province: NE To furnish all required materials, supplies, equipment, tools and plans, to perform all necessary labor and supervision, and to construct, install, erect, equip and complete all work stipulated in, required by and in accordance with the contract documents and the plans, specifications and other documents referred to therein. TIME OF COMPLETION :- May 23, 2025. The City of Grand Island owns an electric system consisting of a 115 kV loop around the City. This transmission loop connects seven distribution substations and two generation substations. The loop also has five 115 kV interconnections, at four substations, to the Nebraska Public Power District (NPPD). The Grand Island Electric Department is soliciting Bids for scheduled load tap changer maintenance of thirteen substation transformers, electrical testing of nineteen substation transformers, and oil processing for one transformer. Descriptions of each transformer are in Appendix 1. Full nameplate, DGA (Dissolved Gas Analysis), and PCB (Polychlorinated Biphenyls) info is available upon request. As part of the LTC maintenance, the contractor will be responsible for: 1. Draining LTC compartment completely and disposing of the old oil 2. Cleaning debris and residue from inside of compartment 3. Providing and replacing arcing contacts (where applicable) 4. Checking wear indicators on vacuum bottles and replacing if necessary (where applicable) 5. Providing and replacing gaskets (where applicable) 6. Hand cranking mechanism to verify no binding on all taps 7. Motor testing mechanism to verify no binding on all taps 8. Verify tap limit switches operate as designed 9. Making any needed adjustments to the mechanism 10. Refill with new mineral oil 11. Verify no leaks

Bid Results

Power Plant

$76,608.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
19
Bidding Soon
228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 19, 2025

Project location map

100 1st St E, Grand Island, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.