Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 22, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a road / highway in Grand Haven, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This Proposal shall be legibly prepared with ink or typed. UNIT PRICES shall be entered in the "Unit Prices" column. Where a LUMP SUM bid is called for, it shall be entered only in the "Amounts" column. The unit prices as stated will govern in determining the correct total of the bid. If a unit price or lump sum bid already entered by the Bidder on the proposal form is to be altered, it shall be crossed out with ink, the new unit price or lump sum bid entered above or below it and initialed by the Bidder, also with ink. Proposals with any unit price or lump sum bid prepared with pencil or omitted will be rejected. Failure to fill in the extensions and the total may invalidate the Proposal. 29.66 miles of HMA surfacing on the following streets in Blendon, Crockery, Georgetown, Grand Haven, Holland, Jamestown, Park, Polkton, Port Sheldon, Tallmadge and Zeeland Townships, Ottawa County. Project No. 459-587: 4.07 miles of shoulder prep, concrete pavement removal, HMA cold milling, butt joints, trenching and HMA widening 3' wide each side, monument box adjust, bridge deck surface removal, bridge deck waterproofing, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, aggregate intersections, slope restoration, and pavement markings on Leonard Street from 112th Avenue to 88th Avenue in Crockery and Polkton Townships. Project No. 459-588: 3.05 miles of Shoulder Prep, concrete pavement removal, HMA cold milling, monument box adjust, adjusting of drainage structure covers, milling around drainage structure covers, gate box adjust, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, aggregate intersections, slope restoration, and pavement markings on Port Sheldon Street from 96th Avenue to 72nd Avenue in Blendon Township. Project No. 485-015: 1.49 miles of concrete pavement removal, HMA cold milling, butt joints, monument box adjust, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, and slope restoration on 8 th Avenue from Luce Street to M-45 in Tallmadge Township. Project No. 495-006-25003: 2.05 miles of concrete pavement removal, HMA cold milling, butt joints, adjusting of drainage structure covers, milling around drainage structure covers, monument box adjust, gate box adjust, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, slope restoration, and pavement markings on Ferris Street from US-31 to 152nd Avenue in Grand Haven Township. Project No. 495-010-25001: 3.53 miles of concrete pavement removal, HMA cold milling, butt joints, adjusting of drainage structure covers, milling around drainage structure covers, monument box adjust, gate box adjust, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, and slope restoration on 152nd Avenue from Lakewood Boulevard to New Holland Street in Park Township. Project No. 495-012-25002: 2.00 miles of concrete pavement removal, HMA cold milling, butt joints, monument box adjust, HMA leveling and top courses, HMA approaches, aggregate shoulders, aggregate approaches, and slope restoration on 152nd Avenue from New Holland Street to Port Sheldon Street in Port Sheldon Township. Project No. 481-005-5526: 7.59 miles of milling and HMA resurfacing of Subdivision Streets in Georgetown Township. Project No. 481-006-5528: 2.83 miles of milling and HMA resurfacing of Subdivision Streets in Grand Haven Township. Project No. 481-007-5529: 1.52 miles of milling and HMA resurfacing of Subdivision Streets in Holland Township. Project No. 481-008-5532: 0.62 miles of milling and HMA resurfacing of Subdivision Streets in Jamestown Township. Project No. 481-017-5527: 0.91 miles of milling and HMA resurfacing of Subdivision Streets in Zeeland Township. The Ottawa County Road Commission and Townships reserve the right to eliminate segments of roads from being worked on. All work shall be completed by September 26, 2025.
Award
Roads / Highways
$1,437,805.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025
Multiple Locations, Grand Haven, MI
Related To This Project
Grand Haven, MI
Bid Date: Mar 26 2025
Grand Haven, MI
Bid Date: Mar 12 2025
Grand Haven, MI
Bid Date: Mar 07 2025
Grand Haven, MI
--
Grand Haven, MI
Bid Date: Mar 19 2025
Grand Haven, MI
Bid Date: Apr 04 2025
Grand Haven, MI
--
Grand Haven, MI
Bid Date: May 14 2025
Grand Haven, MI
--
Grand Haven, MI
Bid Date: Mar 17 2025
Grand Haven, MI
--
Grand Haven, MI
Bid Date: Feb 20 2025
Grand Haven, MI
Bid Date: Feb 19 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.