Renovation of a residential development in New York, New York. Completed plans call for the renovation of a residential development.

SCOPE OF WORK: 1. SCOPE OF WORK A. The work to be done under this Contract consists of providing all labor, materials, equipment and other incidental items required to complete the following: 1. Remove all control wiring from the motorized steam control valve to the terminal box in the tank room. 2. Disconnect the pressure and compound gauges’ connection from zone valvestation. 3. Remove existing steam control zone valve stations including motorized steam control valves, all gate valves, by pass valves, strainers and all associated piping. 4. All valves removed not claimed by NYCHA shall become contractor’s properties and shall be legally disposed. 5. Reconnect the existing pressure and compound gauges to the new steam control zone valve station. 6. Provide new adequate control wiring with conduit from the new motorized steamcontrol valve to the existing terminal box in the tank room. New control cables shall be as specified in Sec. C of the SOW. In the opinions of NYCHA that existing control cables could be reused, NYCHA will give contractor the directions. 7. Test the equipment in all modes of operation. 8. Check piping forleaks. 9. Calibrate new motorized steam control valves to agree with settings as indicated on the heating control panel. 10. Replace heating control panel. The new heating control panel shall be the same model as the one removed or as directed by NYCHA. 11. Reconnect all existing control wiring and electrical wiring to new panels for the proper operation. 12. Install new steam control zone valve stations as per manufacturer’s recommendation and best trade practice. B. A new steam control zone valve station shall include the following: 1. A new motorized steam control valve. 2. New valve shall be MEPCO RTMS type or equal. 3. Two new gate valves, before and after motorized steam control valve - ate valves shall be of iron body, OS and Y type, 125 psig steam or 200 WOG rating. 4. A new strainer before the motorized steam control valve - strainer shall be of the "Y" type with valve blowdown and shall have cast iron body and baskets shall be brass, monel or stainless steel. No plugs will be permitted. 5. All gate valves, strainer, and piping shall be the same sizes as the motorized steam control valve. 6. A new by-pass valve on steam by-pass which shall be globe type rising stem, of same class rating and material as specified for gate valves - bypass valve shall be one size smaller than the motorized steam control valve. 7. Provide all required unions, reducers, fittings, hangers and miscellaneous components which comprise the steam station. 8. Provide modifications and alterations to the existing piping for the proper installations of new steam control zone valve stations, when required. 9. Provide new asbestos free insulation to the new steam control zone valve station. 10. Materials and thickness shall be the same as the existing conjunction piping. C. If adequate control cables are required for the proper operations of new heating control panels, contractor has two (2) options: 1. Use the spare conductors from the existing controlcable. OR 2. As approved and directed, utilize the existing underground spare conduits to install new adequate control cables. This work shall be compensated by allowance. D. New control cables shall be of multi shielded twisted pair type (STP) with a temperature rating 200°C. E. Each conductor to be of No. 16 AWG stranded or solid tinned copper wire, covered with no less than 0.010" in concentric wall of color coded Teflon (TFE) insulation. F. Conductors are to be formed into multi-conductor cable, uniformly round, shielded with tinned copper and covered with a concentric jacket or Teflon impregnated fiberglass. TERM: 3 years plus two one-year extensions (at the discretion of NYCHA). Section 3 and M/WBE: Please be advised that the Section 3 REO & OEO Plans and the M/WBE Utilization Plan & Waiver and other related documentation must be uploaded via eComply, website. Do not include Section 3 or M/WBE documentation within your bid submission via iSupplier. For assistance with eComply log-in, please contact eComply Tech support at support@ecomplysolutions.com. For assistance with M/WBE Utilization Plan and Section 3 REO/OEO Plan submission in eComply, please contact NYCHA’s SMP Vendor Diversity team at eComply.support@nycha.nyc.gov. RFQ Question Submission Deadline 3/7/25 at 2:00PM Question and Answer Release Date 3/14/25 at 2:00PM Interested vendors are invited to obtain a copy of the opportunity at NYCHA’s website by going to website. On the left side, click on “iSupplier Vendor Registration/Login” link. (1) If you have an iSupplier account, then click on the “ Login for registered vendors” link and sign into your iSupplier account. (2) If you do not have an iSupplier account you can request an account by clicking on “New suppliers register in iSupplier” to apply for log-in credentials. Once you have accessed your iSupplier account, log into your account, then choose under the Oracle Financials home page, the menu option “Sourcing Supplier”, then choose “Sourcing”, then choose Sourcing Homepage”; and conduct a search in the “Search Open Negotiations” box for RFQ Number 511440 Note: We are only accepting electronic bids submitted online via iSupplier. Paper bids will not be accepted or considered. Please contact NYCHA Procurement at procurement@nycha.nyc.gov for assistance.

Post-Bid

Residential Subdivision

$212,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,033
Active Projects
568
Bidding Soon
7,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 24, 2025

Project location map

199 Chambers St, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.