BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Site work for a mixed-use development in Montpelier, Vermont. Completed plans call for site work for a educational facility.

1. Mobilization: This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site for the establishment of offices, buildings, and other facilities necessary for work on the project and for all other work or operations which must be performed, or costs incurred when beginning work on the project. 2. Contractor Layout: This work shall consist of the contractor performing or causing to be performed all necessary survey and layout of the improvements, including setting line and grade. The engineering consultant will be responsible for setting control points, but the contractor will be responsible for the layout of all other improvements. 3. As-builts: This work shall consist of the contractor providing to the owner a complete set of asbuilt drawings that satisfactory depict the location (line and grade) of all improvements installed as part of this contract. This shall be provided as both a paper copy and an electronic copy. 4. Soils Testing: This project is located within a designated Urban Area. Any testing required by a receiving site within the Urban Area is included in the cost of MOBILIZATION/CONTRACTOR WORK. In the event testing reveals that soils exceed the contaminate levels to be classified as Urban Soils, additional testing required to determine the appropriate soils disposal methods will be paid for separately by the Owner in accordance with Special Provision #5 - DISPOSAL OF CONTAMINATED SOILS. Questions shall be submitted via Online. All questions shall be submitted by 1:00:00 PM, 3/14/2025. Greenprint Partners (Owner) is requesting Bids for the construction of the following Project: Barre Town Elementary and Middle School Barre Town Elementary and Middle School Stormwater Improvements The Project includes the following: Construction of a bioretention system with a forebay and grass swale for stormwater management.

Bid Results

Water / Sewer

$269,955.00

Public - City

Site Work

7

9

9

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
94
Bidding Soon
856
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

June 15, 2025

Project location map

Multiple Locations, Montpelier, VT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.