Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a mixed-use development in Culver, Oregon. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Veteran's Memorial Park Expansion - 2025 Est. Value Notes: $775,000 to $850,000 The Project includes the following Work: Construction of a local street, with stormwater, sewer, and water service line improvements; parking areas; curbs, gutters, sidewalks; and Americans with Disabilities Act ramps; and park improvements, including underground stormwater facilities, water service lines, an automated irrigation system, a water fountain, track receptacles, and solar streetlighting. The Contractor awarded this Contract will be required to coordinate their work with independent skate park and pump track contractors, who will be performing work that is not part of this Contract. The Contract is subject to the applicable provisions of ORS 279C.800 through ORS 279C.870, the Oregon Prevailing Wage Law. The Project has two milestones. Milestone 1 has an expected completion date of July 30, 2025, and includes completion of the street and park improvements within the North Sequencing Area of the park expansion area. Milestone 2 has an expected completion date of August 15, 2025, and includes the completion of stormwater facilities and grading of a pump track pad (pump track to be completed by others). The anticipated dates for substantial completion and final payment are November 15, 2025, and December 15, 2025, respectively. Document info : Prospective Bidders may examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 8:00 a.m. and 5:00 p.m. or at the location listed below. City of Culver, 200 First Avenue, Culver, Oregon *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 03/14/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information for such questions is as follows: A. Bryce Wininger, P.E., 3818 S.W. 21st Street, Suite 302, Redmond, Oregon 97756, bwininger@andersonperry.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered. Bid result - SCHEDULE A - JAL Construction, Inc. $360,575.00 SCHEDULE B - JAL Construction, Inc. $376,133.00

Bid Results

Water / Sewer

$736,708.00

Public - City

Paving, Site Work

39

54

8

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
3
Bidding Soon
289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

To Be Determined, Culver, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.