Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 23, 2025 at 8:00 PM
Updated October 30, 2025
Site work, paving and outdoor lighting for a mixed-use development in North Miami Beach, Florida. Completed plans call for outdoor lighting for a road / highway; for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Roadway Improvements to NE 151st Street - Phase 1 Contract Base Estimate is $4,448,339.93 LICENSE REQUIREMENT: General Engineering; Paving SBE Service: 1.0% SCOPE OF WORK: The project consists of roadway improvements which include, the reconstruction of the existing 4- lane road to a 6-lane roadway with raised medians, sidewalks, curbs and gutters, storm water drainage system, pavement markings and signage, signalization modifications and roadway lighting. Project Background: The existing NE 151st Street from Biscayne Boulevard to Bay Vista Boulevard serves as the main entrance to educational institutions such as the Florida International University Biscayne Bay Campus, the David Lawrence Jr. K-8 School and the Alonzo & Tracy Mourning Senior High School. A feasibility study prepared in 2015 by R.J. Behar & Company, Inc. for DTPW recommended to widen the segment from 4 to 6 lanes. The study took into consideration a Planning Study prepared by Kimley-Horn and Associates, Inc. for the Miami-Dade County MPO in 2011 which purpose was to evaluate the feasibility of adding another entrance to FIU's Biscayne Bay Campus concluding that the only feasible access improvement was to expand NE 151st Street from a 4-lane to a 6-lane roadway from Biscayne Boulevard to Bay Vista Boulevard. This corridor expansion would relieve the current traffic congestion and provide improved mobility for the planned enhancements to the Florida International University, anticipated growth of the other educational institutions along the route and the planned development of the Biscayne Landing Community. Bonds (Bid, Performance and Payment): Each Bid Must Be Accompanied by a Certified Check or Acceptable Bid Bond in the Amount of Five Percent (5%) of the Proposed Total Bid Amount as Guarantee That the Bidder, if Awarded the Contract Will Provide, as Set Forth in the Bid Documents, a Performance and Payment Bond Satisfactory to Miami-dade County, Department of Transportation and Public Works, Equal to One Hundred (100%) Percent of the Total Contract Award Amount. Bidders May Not Withdraw Their Bids for a Period of One Hundred And Eighty (180) Calendar Days After the Bid Opening, After Which They May Be Requested to Extend Their Bids Until Either a Notice of Contract Award or a Notice of Rejection of Bids Has Been Filed With The Clerk of the Board, Miami-dade County. All RFI's requests should be e-mailed to Marco Movilla at Marco.Movilla@miamidade.gov while copying the Clerk of the Board (clerkbcc@miamidade.gov). In accordance with Miami-Dade County Ordinance No.'s 5-29 and A.O. 3-41, an SBE-S&G goal of 1.00% has been established for this Project. Question Deadline 10/10/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered.
Post-Bid
Roads / Highways
$4,448,339.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
