Site work and new construction of a water / sewer project in North Miami Beach, Florida. Completed plans call for the construction of a 35,040-square-foot, two-story above grade water / sewer project; and for site work for a water / sewer project.
Estimated Range of the Base Bid - $113,776,600 to $137,663,400, not including contingency and dedicated allowances *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. To obtain a direct invitation to the meeting, email to Jean-Marie.Rodriguez@miamidade.gov and Antoinette.Altamirano@miamidade.gov with cc to Clerk.Board@miamidade.gov. The bid proposal must be accompanied by a bid security in an amount not less than five percent (5%) of the total bid. The successful contractor must execute a one hundred (100%) surety performance and payment bonds. The original bid bond must be delivered to the contracting officer at the address above prior to the bid opening or a bid will be deemed non-responsive. No bidder may withdraw his bid within 120 days from bid opening date. This project consists of the construction of a new Electrical Distribution Building at the North District Wastewater Treatment Plant. The new EDB will provide power to the new High Level Disinfection facility and IWPS substations. Project Duration: 1,052 Calendar Days to Substantial Completion, 1,112 Calendar Days to Final Completion, plus a 111 Calendar Day Contingency Period. The Board of County Commissioners, Miami-Dade County, Florida, reserves the right to reject any or all bids, to waive any informality in any bid or to re-advertise for bids. Bids from any person, firm or Corporation in default on other contracts or agreements with the County may be rejected. Failure by the Bidder to satisfy claims on previous contracts with the County may be cause for rejection of his bid. The County reserves the right to postpone or cancel the bid opening at any time prior to the scheduled opening of bids. Requests for informtion (rfis) will only be accepted up to close of business on monday, april 21, 2025 at 5:00 p.M. Any rfi received after this date will not be considered. S050010 , 16071
Award
Water / Sewer
$137,663,400.00
Public - County
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2025
January 12, 2026
2575 NE 156th St, North Miami Beach, FL
Related To This Project
North Miami Beach, FL
Bid Date: May 12 2025
North Miami Beach, FL
Bid Date: May 14 2025
North Miami Beach, FL
Bid Date: Jul 03 2025
North Miami Beach, FL
Bid Date: Jun 23 2025
North Miami Beach, FL
Bid Date: Aug 06 2025
North Miami Beach, FL
--
North Miami Beach, FL
Bid Date: Jul 10 2025
North Miami Beach, FL
--
North Miami Beach, FL
--
North Miami Beach, FL
--
North Miami Beach, FL
--
North Miami Beach, FL
Bid Date: Mar 14 2025
North Miami Beach, FL
Bid Date: Oct 29 2025
North Miami Beach, FL
Bid Date: Mar 04 2025
North Miami Beach, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.