BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of a water / sewer project in North Miami Beach, Florida. Completed plans call for the renovation of a water / sewer project.

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work). Work includes all materials, stainless steel metal exhaust ducts, special order one motorized damper, per testing section (total of 2 dampers), professional rigging, incidentals, and all Labor costs associated with it. Approximate estimate to include all labor and materials, and new stainless steel metal round exhaust ducts Present existing System: Testing the sampler hoods station. Stainless steel and welded joint fabrication are to be installed. Scope of Work: Remove existing stainless-steel exhaust ducts as necessary to prepare for measurements of the new replacement ducts. Measure existing round ducts, including one motorized damper in the measurements, and fabricate new exhaust ducts to match the dimensions of stainless-steel round metal ducts. All new exhaust ductwork will be stainless steel with welded joints, including necessary transitions and takeoffs. All fasteners, unit-struts, clamps, bolts, nuts, washers, hardware, etc., must be stainless steel. Please, NO SUBSTITUTIONS. HVAC Contractor must provide Lockout/Tagout certification. (If necessary) HVAC Contractor will provide Electrical reconnections as per the Code to operate the new motorized damper. The work area and facility must always remain clean and dust-free. All work will be scheduled and coordinated with the WASD HVAC Supervisor. All work will be inspected and approved by the WASD HVAC Supervisor. Electrical connections will be approved by the Plants electrical staff. (If necessary) Time/Work to be performed: All working hours will be coordinated with HVAC staff and performed during regular, after-hours, or weekend hours. Project hours - Monday - Sunday: 7:00 a.m. to 9:00 p.m Weekend: yes. Liquidated Damages: YES $$ Per Day: $500.00 Anticipated Start Date: 7/11/2025 Calendar Days for Project Completion: 5

Award

Water / Sewer

$24,192.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
112
Bidding Soon
1,727
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

July 11, 2025

Project location map

2575 NE 156th St, North Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.