BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Site work and paving for a mixed-use development in Fresno, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The scope of work includes but is not limited to; Grind, overlay and full-depth reconstruction along Herndon Avenue from Valentine Avenue to Marks Avenue. The project also includes curb ramp improvements, signal loop detectors, signage and striping. The Construction Allocation for this project is $1,318,535.00. All proposals must be made on the Bid Proposal Form provided by the Purchasing Manager. A Bid Deposit, which can be provided separately, in the amount of TEN PERCENT (10%) of the Total Net Bid Amount (or, in bids with Add Alternates, the highest possible combination of the Base Bid plus Add Alternates) in the form of a certified or cashier's check, an irrevocable letter of credit, or a certificate of deposit or a bidder's bond executed by a corporate surety, admitted by the California Insurance Commissioner to do business in California, payable and acceptable to the City of Fresno; or the Bidder shall have registered with the Purchasing Manager of the City an annual bid bond sufficient to provide coverage in such amount. All Bid Deposits will be held until a Contract has been executed with the successful Bidder or all bids have been rejected. Copies of Bid Deposits may be submitted electronically, with the exception of a certified or cashier's check, which must be brought to the Purchasing Manager's office and labeled accordingly with the bid number prior to the bid opening. A 100 percent Payment Bond and 100 percent Performance Bond for all public works contracts must be filed with the Contract Documents and approved by the City before the Contractor enters upon performance of the Work. No bid will be considered for award unless the Bidder at the time of bid opening, is licensed with a valid Class "A" or "C-10" Contractor's License issued by the State of California. Project Duration 165 working days from Notice to Proceed Bidders are advised that, as required by federal law, the City of Fresno is implementing new Disadvantaged Business Enterprise requirements for Disadvantaged Business Enterprises (DBE). The DBE goal for thisProject is SEVENTEEN PERCENT (17%). DBE participation shall be calculated on the basis of the Total Net Bid Amount and on all possible combinations of the Base Bid plus Add Alternate(s), if applicable. The City reserves the right to reject any and all bids.

Bid Results

Roads / Highways

$992,655.00

Public - City

Paving, Site Work

12

5

12

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
0
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 9, 2025

Project location map

E Herndon Ave, Fresno, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.