Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 10, 2025 at 8:00 PM
Updated May 11, 2025
Remodeling of an educational facility in West Jordan, Utah. Completed plans call for the remodel of a 380,000-square-foot educational facility.
**As of May 07, 2025, this project has been awarded to MHTN Architects but the bid amount is not yet available.** The Jordan School District (JSD, District) is requesting qualifications from experienced and qualified Construction Manager/General Contractor (CM/GC) firms to provide pre-construction services and act as the General Contractor (Contractor) for the renovation of approximately 380,000 square feet at West Jordan High School. The selected CM/GC will work closely with the District, design professionals, and other stakeholders to complete the renovation within budget, on schedule, and to the highest quality standards. The renovation work at West Jordan High School will address several key areas to update the facility, including architectural, electrical, mechanical, and structural upgrades. The scope of work includes, but is not limited to, the following: Finishes o Resilient flooring and carpet. o Wall finishes and ceiling updates. Accessibility (ADA) o Updating doors, hardware, restrooms, and site access to meet current accessibility standards. o Safety and Security o Safety updates to conform with recent legislation and USBE recommendations. Locker Room and Weight Room Expansions CTE (Career and Technical Education) Program Updates and Expansion Auditorium Updates Relocation of Pro-Start Kitchen to Main Level Roof Replacement Exterior Storage Construction Electrical Updates o Installation of new, energy-efficient LED lighting throughout the school. o Lighting controls updated to meet current code requirements. o Installation of additional power for classrooms. Audio-Visual Components o New audio-visual systems for teaching spaces. Mechanical Updates o Updates to the automatic temperature controls. o Replacement or updating of outdated mechanical equipment. Structural Updates o Structural improvements to address seismic deficiencies Fixed Limit of Construction Cost (FLCC) for the CM/GC is $87,000,000. The CM/GC must be capable and willing to work closely with the Owner and Design Professional (which is MHTN Architects through the design phase), providing cost estimates, schedules and feedback on constructability of design details and availability of materials selected. It is anticipated that plans will be complete as early as October 2025. Construction is expected to commence as early as late Fall 2025 or early Spring 2026, with completion by July 2030. This is the cost of payment and performance bonds based on an amount equal to 100% of the FLCC amount. Last Day to Submit Questions May 1 12:00 Noon The Jordan School District Board of Education reserves the right to reject any or all proposals, or to waive any formality or technicality in any proposal in the best interest of the District.
Award
Educational
$87,000,000.00
Public - County
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
January 6, 2026
8136 2700 W, West Jordan, UT
Related To This Project
West Jordan, UT
Bid Date: Sep 09 2021
West Jordan, UT
Bid Date: Mar 18 2025
West Jordan, UT
Bid Date: Mar 19 2025
West Jordan, UT
Bid Date: Mar 18 2025
West Jordan, UT
Bid Date: Mar 26 2025
West Jordan, UT
Bid Date: Mar 25 2025
West Jordan, UT
Bid Date: Mar 20 2025
West Jordan, UT
Bid Date: Mar 14 2025
West Jordan, UT
Bid Date: Mar 25 2025
West Jordan, UT
--
West Jordan, UT
--
West Jordan, UT
--
West Jordan, UT
--
West Jordan, UT
--
West Jordan, UT
Bid Date: Mar 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
