Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 25, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of an educational facility in Newville, Pennsylvania. Completed plans call for the renovation of a educational facility.
Big Spring High School s Cellular Signal Boosting Project, 100 MountRock Road, Newville PA 17241, bid notes : Bids will be publicly opened and read aloud immediately after the scheduled closing time for receipt of Bids. Bids received after the above-referenced date and time shall be returned to the Bidder unopened. Awarded contractor will supply labor and materials to install and test a cellular signal boosting system with "full building" cellular coverage at Big Spring High School. The system must be designed to boost cellular signal throughout the high school's first, second, and third floors. Exterior antennas will be mounted on the building roof, oriented toward existing cellular towers (No roof penetrations). Boosters will be mounted inside the building in the appropriate IDF closet locations, using available electric outlets. Antennas will be mounted in drop ceiling (dome antenna) and on walls (panel antenna) based on the building floor plan to ensure cellular coverage is amplified in the required areas. Cabling required for system connection will be installed, terminated, tested and label appropriately. a. Indoor Power [dBm] rating must be 75.000 or better throughout all three floors b. Equipment to be Included or substitute with equivalent commercial grade equipment (proposal to include itemized list of all parts and quantities used): i. Force 5 2.0 Boosters with Yagi Antenna ii. 5X Max Boosters with ERT and Yagi Antenna iii. Indoor Ultra-Thin Dome Antennas (Drop Ceiling Mount) iv4. Indoor Panel Antennas (Wall Mount) v. Coax Cable - Yi Indoor Plenum vi. Coax Cable - Outdoor vii. #10 Ground Wire viii. 12-way Wideband Splitters ix. 4-way Wideband Splitters x. Directional Couplers (-6dB) xi. Lightening Protector with Cable xii. Mise, material (any required conduit, mounting hardware, duct seal, fire putty, cable hanging hardware, etc.) All questions--pertaining to technical sections shall be directed in writing to: Mike Fronk, Infrastructure Engineer, email:mfronk@bigspring.k12.pa.us .
Sub-Bidding
Educational
$140,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
June 2, 2025

100 Mt Rock Rd, Newville, PA
Related To This Project
Newville, PA
Bid Date: Sep 17 2024
Newville, PA
Bid Date: May 16 2024
Newville, PA
Bid Date: Nov 07 2023
Newville, PA
Bid Date: Mar 14 2024
Newville, PA
Bid Date: Mar 14 2024
Newville, PA
Bid Date: Mar 14 2024
Newville, PA
Bid Date: Apr 30 2020
Newville, PA
Bid Date: Mar 11 2021
Newville, PA
Bid Date: Feb 16 2023
Newville, PA
Bid Date: Dec 21 2022
Newville, PA
--
Newville, PA
Bid Date: Mar 31 2022
Newville, PA
--
Newville, PA
Bid Date: Feb 16 2023
Newville, PA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Big Spring School District for the Installation of a Cellular Signal Boosting System at Big Spring High School
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.