BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a civil project in Worthington, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

E 9th Avenue Full Street Reconstruction Site Address: E 9th Avenue: 10th to 11th Street City: Worthington County: Nobles State/Province: MN Major Project Items Include: 960 Sy Remove Concrete Pavement With Bituminous 215 Lf Remove Existing Sanitary Pipe 970 Sy Geotextile Fabric Type Iv (Modified) 220 Cy Drainable Aggregate Base, Dsb (Cv) 180 Ton Type Sp 12.5 Wearing Corse Mixture (2, C) 765 Lf 4" Perf Pe Pipe Drain (Subgrade Installation) 640 Lf Trench Excavation and Backfill (Trench Box) 420 Lf 6" Pvc Water Main (Sdr 18) 645 Lbs Water Main Fittings 220 8" Pvc Sanitary Sewer (Sdr 35)

Award

Water / Sewer

$156,176.00

Public - City

Paving, Site Work

16

5

2

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
60
Bidding Soon
427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 14, 2025

Project location map

E 9th Ave, Worthington, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.