Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 12, 2025 at 8:00 PM
Updated May 14, 2025
Site work and paving for a mixed-use development in Burnsville, Minnesota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following work: BASE BID - Colonial Park & Oak Leaf West Park: Remove fences, pulverize courts, new concrete curb, new fences, install asphalt binder and surface course, cut control joints and install Armor, apply 4 coat color system and striping. ALTERNATE BID #1 - Colonial Park & Oak Leaf West Park Only: Install fiberglass over entire court area. ALTERNATE BID #2 - North River Hills Park: On the existing courts: remove all fences, fabrics, posts, net posts, center tie downs, bang board and dispose of off-site. Benches to be removed and given to the city. Remove all asphalt courts, concrete curbs, asphalt walks and concrete walks. Remove 5" of stone base and dispose of. Truck in topsoil from new court area and level. Purchase and install new topsoil over the entire area back to original grade. Seed area. On new site: Remove fences, pulverize courts, new concrete curb, new fences, install asphalt binder and surface course, cut control joints and install Armor, apply 4 coat color system and striping. ALTERNATE BID #3: North River Hills Park: Install fiberglass over entire court area. ALTERNATE BID #4: North River Hills Park: Remove lights, light poles, light pole bases and all control panels at the old courts and dispose of. The bid bonds must be payable to the City of Burnsville in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages in the event that the bid is accepted and the bidder shall fail to promptly enter into a written contract and furnish the required bond. The City of Burnsville reserves the right to reject any or all bids, to waive informalities, and to award the bid in the best interest of the City. No bids may be withdrawn for a period of sixty (60) days. All questions regarding the Plans and Contract Documents are to be submitted to the Engineer in writing.
Bid Results
Playgrounds / Parks / Athletic Fields
$275,183.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
May 12, 2025
Multiple Locations, Burnsville, MN
Related To This Project
Burnsville, MN
Bid Date: Apr 01 2025
Burnsville, MN
Bid Date: Mar 31 2025
Burnsville, MN
Bid Date: Mar 26 2025
Burnsville, MN
Bid Date: Apr 02 2025
Burnsville, MN
Bid Date: Apr 17 2025
Burnsville, MN
Bid Date: Apr 18 2025
Burnsville, MN
Bid Date: Apr 11 2025
Burnsville, MN
Bid Date: Apr 25 2025
Burnsville, MN
Bid Date: Mar 07 2025
Burnsville, MN
Bid Date: Aug 30 2021
Burnsville, MN
Bid Date: Feb 11 2025
Burnsville, MN
Bid Date: Feb 07 2025
Burnsville, MN
Bid Date: Jan 23 2025
Burnsville, MN
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
