Site work and paving for a mixed-use development in Garden City, Kansas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

2025 Stormwater Drainage & East Riverside Trail Improvement Projects for the City of Garden City, Kansas No bidder may withdraw his bid for at least thirty (30) days after the scheduled closing time for the receipt of bids. The City reserves the right to reject any or all bids, to waive informalities, and to accept the bid deemed to be in the best interest of the public. Direct all questions on the bidding procedure and project information to: David Baca Public Works/ Utilities InfrastructureInspector City of Garden City, Kansas (620) 276-1291 (office) (620) 640-5955 (mobile) Scope of Services and Standards of Work (Part A) Contractor obligations: To supply the labor, materials, and equipment specified as necessary to provide forces capable of independently performing excavation, backfill, grading, remove and replace storm inlets, and removing and replacing storm drainpipes belonging to the City. The Contractor must understand the work is around active daily traffic and will require the contractor to properly all requested traffic control items for each project. All work is to be accomplished in accordance with the directions of the designated representative of the City. (See Scope of Services attachment). 1. Clearing of Soil/Concrete Waste: The contractor shall be financially and physically responsible for disposing of all products resulting from the grading and removal process. 2. Removing and Replacing Storm Inlets I Pipe: All inlets and HOPE pipes will be supplied by the City for specific areas. The contractor with be physically and financially responsible for supplying all other materials needed for proper fill, backfill, concrete placement, and inlet lids. 3. Removing and replacing valley Gutters: The contractor shall be financially and physically responsible for disposing of all products resulting from removing the existing concrete. The contractor shall be responsible for placing the correct flow line for all concrete work. 4. Traffic Control Items I Placement: The Contractor shall exhibit proper installation and placement of all requested traffic control items per project. Some areas will require more items than others, please review each project's traffic control layout. 5. 811 (One Call System): The contractor is responsible for contacting the Kansas one-call system (call 811) three business days prior to the start of construction to locate all utilities within the project area.

Award

Sidewalks / Parking Lot

$96,205.00

Public - City

Paving, Site Work

31

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
15
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

April 9, 2025

Project location map

Multiple Locations, Garden City, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.