Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 18, 2025
Renovation of a theater / auditorium in Grand Rapids, Michigan. Completed plans call for the renovation of a theater / auditorium.
Summary of Work Act as Contractor for Removal, Disposal and Installation of New Auditorium Seating. SUMMARY OF WORK Act as Contractor for Construction and Installation of auditorium seating replacement. - Contractor to establish new seating layout (to be reviewed and approved by owner). - Contractor to remove and dispose of existing seating. Contractor to provide dumpster(s). - Contractor to remove existing dedication plaques per seat and return to owner. - The Basis of Design for new seating: Irwin Seating Company - Rialto; model 29.15.REST.4. The following components, options, accessories, upholstery and finishes: - Historic profile padded and upholstered backrest with 2-inch poly foam, one piece tailoring with decorative welt, veneer reveal inner panel, 9-ply hardwood rear panel surfaced with class A veneer and attached with concealed fasteners. - 11/16" thick Il-ply veneer plywood seat with upholstered 3-inch poly pad. Short depth for maximum knee space. - Steel floor mount center stanchions (powder coat finish), cantilevered as necessary to avoid existing HVAC floor vents. - Barrier Free required end of row stanchions with a flip-up armrest (as required by ADA & MBFC). - Adapt and restore existing cast iron end of row stanchions for reuse. - New banana shape solid hardwood end of row armrests. - Concealed LED aisle lighting - Flat solid hardwood center arm rests. - All wood to be Maple species - Rotary Cut. - Bronze or aluminum oval row designation letter plates, mounted on aisle end arm block. - Bronze or aluminum oval seat designation number plates, mounted on seat arm. - Standard wood stain colors. - Standard powder coat colors. - Standard Fabric: Allowance for fabric costing $19.95 per yard (mill pattern, and color TBD). - Wood lag screws for wood floor mounting. - Coordinate removal, disposal and installation of seating with General Contractor and Owner.
Post-Bid
Theaters / Auditoriums
$580,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
April 14, 2025
421 Fountain St NE, Grand Rapids, MI
Related To This Project
Grand Rapids, MI
Bid Date: Mar 18 2025
Grand Rapids, MI
Bid Date: Mar 14 2025
Grand Rapids, MI
Bid Date: Mar 20 2025
Grand Rapids, MI
Bid Date: Apr 08 2025
Grand Rapids, MI
--
Grand Rapids, MI
Bid Date: Mar 19 2025
Grand Rapids, MI
Bid Date: Apr 04 2025
Grand Rapids, MI
Bid Date: Apr 04 2025
Grand Rapids, MI
Bid Date: Mar 13 2025
Grand Rapids, MI
--
Grand Rapids, MI
Bid Date: Jan 13 2026
Grand Rapids, MI
Bid Date: Mar 21 2025
Grand Rapids, MI
Bid Date: Mar 06 2025
Grand Rapids, MI
Bid Date: Mar 04 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
