BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2025 at 8:00 PM

Updated April 26, 2025

Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Palmetto, Florida. Completed plans call for the addition of a playground / park / athletic field; for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; pre-engineered storage facility; and water / sewer project.

Construct up to four additional soccer fields depending on site conditions, including synthetic turf system to stabilize the fields. A synthetic turf system including the enhanced base material provides cost-effective solutions for fields of any size and purpose. This project also includes solar lighting for paths and walkways, LED sports lighting for the new soccer fields; paved parking lot; parking lot lighting; expanded access road to accommodate access needs with overflow grass parking along the drive; restroom building; maintenance/storage building or shed; site utility improvements including potable water supply, sanitary sewer/stormwater conveyance and site electrical improvements; installation of proper drainage, installation of synthetic turf irrigation system, landscaping; bleachers and shade structures, site furnishings, and all appurtenances and amenities required for a functional facility. The County reserves the right to accept or reject any and/or all bids/proposals, to waive irregularies and technicalities, and to request resubmission. Also, the County reserves the right to accept all or any part of the bid/proposal and to increase or decrease quantities to meet additional or reduced requirements of the County. The estimated project completion time frame for the pre-construction and construction phase is 548 calendar days from the Notice to Proceed The County has budgeted the project construction cost at approximately $3.85 million. Question Deadline 04/04/2025 at 5:00 PM ET Questions and inquiries should be submitted via email to the Designated Procurement Contact, Email: Dave.Janney@mymanatee.org

Post-Bid

Playgrounds / Parks / Athletic Fields

$3,850,000.00

Public - County

Addition, Demolition, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
9
Bidding Soon
1,410
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

August 25, 2025

Project location map

7550 69th St E, Palmetto, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.