Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 24, 2025 at 8:00 PM
Updated April 26, 2025
Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Palmetto, Florida. Completed plans call for the addition of a playground / park / athletic field; for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; pre-engineered storage facility; and water / sewer project.
Construct up to four additional soccer fields depending on site conditions, including synthetic turf system to stabilize the fields. A synthetic turf system including the enhanced base material provides cost-effective solutions for fields of any size and purpose. This project also includes solar lighting for paths and walkways, LED sports lighting for the new soccer fields; paved parking lot; parking lot lighting; expanded access road to accommodate access needs with overflow grass parking along the drive; restroom building; maintenance/storage building or shed; site utility improvements including potable water supply, sanitary sewer/stormwater conveyance and site electrical improvements; installation of proper drainage, installation of synthetic turf irrigation system, landscaping; bleachers and shade structures, site furnishings, and all appurtenances and amenities required for a functional facility. The County reserves the right to accept or reject any and/or all bids/proposals, to waive irregularies and technicalities, and to request resubmission. Also, the County reserves the right to accept all or any part of the bid/proposal and to increase or decrease quantities to meet additional or reduced requirements of the County. The estimated project completion time frame for the pre-construction and construction phase is 548 calendar days from the Notice to Proceed The County has budgeted the project construction cost at approximately $3.85 million. Question Deadline 04/04/2025 at 5:00 PM ET Questions and inquiries should be submitted via email to the Designated Procurement Contact, Email: Dave.Janney@mymanatee.org
Post-Bid
Playgrounds / Parks / Athletic Fields
$3,850,000.00
Public - County
Addition, Demolition, Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
August 25, 2025
7550 69th St E, Palmetto, FL
Related To This Project
Palmetto, FL
Bid Date: Mar 18 2025
Palmetto, FL
--
Palmetto, FL
--
Palmetto, FL
--
Palmetto, FL
Bid Date: Apr 03 2025
Palmetto, FL
Bid Date: Apr 24 2025
Palmetto, FL
--
Palmetto, FL
--
Palmetto, FL
--
Palmetto, FL
Bid Date: Mar 04 2025
Palmetto, FL
--
Palmetto, FL
Bid Date: Feb 14 2025
Palmetto, FL
--
Palmetto, FL
Bid Date: Feb 28 2025
Palmetto, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
